首页> 外文会议>European Symposium of the Working Party on Computer-Aided Process Engineering >Periodic Scheduling of Multiproduct Continuous Plants using a RTN Continuous-time Formulation
【24h】

Periodic Scheduling of Multiproduct Continuous Plants using a RTN Continuous-time Formulation

机译:使用RTN连续时间配方的多份子连续工厂的定期调度

获取原文

摘要

This paper considers the problem of deriving an optimal periodic schedule for an M-stage, P-product multiproduct plant with sequence dependent changeovers. A Mixed Integer Non-Linear Programming (MINLP) continuous-time mathematical formulation is proposed, which allows for different product sequences in different stages and variable processing rates. The performance of the Resource-Task Network (RTN) based formulation is illustrated through the solution of a 2-stage, 3-product example problem, with the results showing it to be capable of achieving significant better solutions than the MINLP periodic scheduling formulation of Pinto and Grossmann (1994). However, the complexity of the proposed formulation is apparent and increases steeply with an increase in the number of products/stages.
机译:本文考虑了使用序列依赖性转换的M级P-MATER多程序厂获得最佳定期计划的问题。提出了一种混合整数非线性编程(MINLP)连续时间数学制剂,其允许不同阶段的不同产品序列和可变处理速率。基于资源任务网络(RTN)的制定的性能通过2阶段,3-产品示例问题的解决方案说明了结果,结果表明它能够实现比MinLP定期调度制定的显着更好的解决方案Pinto和Grossmann(1994)。然而,所提出的制剂的复杂性是显而易见的,并且随着产品数量/阶段的增加而急剧增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号