首页> 美国政府科技报告 >Optimal Scheduling of a Multiprocessor-Multiproduct Plant Based on Received Orders.
【24h】

Optimal Scheduling of a Multiprocessor-Multiproduct Plant Based on Received Orders.

机译:基于接收订单的多处理器 - 多产品工厂优化调度。

获取原文

摘要

The report presents a possible approach to the problem of scheduling production according to received orders. In a multiprocessor-multiproduct plant one of the problems of production scheduling is to determine the amount of in-process inventory levels,because having an inventory will provide a fast delivery to a customer. It is desirable to follow a production schedule such that customer orders are filled as soon as possible while total production cost (including inventory cost) is kept at a minimum. This report presents: (1) a formulation of the physical constraints into mathematical terms;and (2) a feasibility study showing the application of these equations in optimal scheduling of a primary mill based on the received orders. The plant described consists of seven processors,two in-process inventories,and one final inventory. A sample problem is presented which includes schedules for six months. The appendices include: (1) input format used in this report; (2) MPS format; (3) optimal values of constraints;and (4) optimal values of variables.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号