首页> 外文会议>European Symposium of the Working Party on Computer-Aided Process Engineering >Simultaneous Site-Wide Energy, Waste and Production Optimization - Industrial Case Studies
【24h】

Simultaneous Site-Wide Energy, Waste and Production Optimization - Industrial Case Studies

机译:同步场地宽的能源,废物和生产优化 - 工业案例研究

获取原文

摘要

In a petrochemical plant site, production, waste treatment and utility systems are three essential elements. They interact with each other via the flows of utility, waste and material, hence creating a lot of options and economic trade-offs among them. To obtain the optimal solutions for the trade-offs, site-wide bottlenecks must be located accurately. Then the three systems could be debottlenecked and optimized simultaneously. This paper proposes the Site-Model, a mathematical model, to debottleneck and optimize the petrochemical plant site site-widely. The model adopts a technique called the marginal value analysis (MVA) for achieving the task.
机译:在石油化工植物部位,生产,废物处理和公用事业系统是三个基本要素。它们通过公用事业,浪费和材料的流动互相互动,因此在其中创造了许多选择和经济权衡。为了获得权衡的最佳解决方案,必须准确地定位站点宽的瓶颈。然后,这三个系统可以同时进行脱位和优化。本文提出了网站模型,数学模型,脱肉特线,广泛优化石化工厂网站。该模型采用称为边缘值分析(MVA)的技术来实现任务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号