【24h】

DESIGN/BUILD HIGHWAY BLASTING o CASE STUDY

机译:设计/打造高速公路爆破O案例研究

获取原文

摘要

The New Mexico Department of Transportation (NMDOT) and the Federal Highway Administration (FHWA) have let a contract to Sierra Blanca Constructors for a design / build contract along 38 miles US 70 in Lincoln County,New Mexico.The project will improve safety of travel along the corridor and facilitate the adopted economic development goals of the state.Proposed improvements include widening the existing highway from two lanes to four lanes,providing left turn lane options at selected locations,improving access for businesses and residences,aesthetically enhancing retaining walls,improving storm drainage and replacing the existing pavement with a 30 year mechanistic imperialistic perpetual pavement design
机译:新墨西哥州的交通部(NMDOT)和联邦公路管理局(FHWA)让塞拉尔布兰卡建设者沿着新墨西哥州林肯县的38英里的38英里沿线设计/建造合同。该项目将提高旅行安全沿着走廊沿着走廊,促进了国家的经济发展目标。推出的改进包括将现有公路从两个车道扩大到四个车道,在所选地点提供左转车道选择,改善企业和住宅的访问,美学上增强挡土墙,改善用30年的机械帝国主义的长期路面设计取代现有路面的风暴排水

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号