首页> 外文会议>West Virginia Surface Mine Drainage Task Force Symposium >MONDAY CREEK ECOSYSTEM RESTORATION FEASIBILITY STUDY
【24h】

MONDAY CREEK ECOSYSTEM RESTORATION FEASIBILITY STUDY

机译:Monday Creek生态系统恢复可行性研究

获取原文

摘要

The U.S. Army Corps of Engineers, in partnership with the Ohio Department of Natural Resources, Division of Mines and Reclamation, is conducting a Feasibility Study to evaluate the applicability and feasibility of various restoration solutions to the overall degradation of the ecosystem of the Monday Creek Watershed. The watershed encompasses 116 square miles (74,240 acres) of Perry, Athens and Hocking Counties, Ohio. Extensive portions of the watershed have been subjected to underground and surface mining since the mid- 1800s and a number of stream reaches are sterile and unable to support diverse, aquatic life due to acid mine drainage (AMD). In addition to the Corps and the ODNR, seven other federal, state and local agencies are actively involved in the project. West Virginia is one of the agencies and its primary role was to develop and use a computer model called the Total Acid Mine Drainage Loading (TAMDL) model simulate the evolution of stream water quality affected by acid mine drainage. The objectives of this paper are to describe the Corps' processes for addressing AMD projects, to presents the results of the model study, and to explain how the stakeholders have worked together to develop a comprehensive plan to address the problems in the Monday Creek Watershed.
机译:工程师的美国军团,在自然资源,矿产和农垦部,俄亥俄部合作正进行可行性研究,以各种恢复解决方案的适用性和可行性评估到周一河流域生态系统的整体退化。分水岭包括116平方英里(74240英亩)佩里,雅典和霍金县,Ohio的。的广泛部分分水岭已自19世纪中期进行地下和地表采矿和多个流达到的是无菌的并且不能支持不同的,水生生物是由于酸性矿山排水(AMD)。除了兵团和ODNR外,还有七个其他联邦,州和地方机构积极参与该项目。西弗吉尼亚州是机构之一,其主要作用是开发和使用称为总酸性矿山废水加载(TAMDL)模型模拟​​受酸性矿山废水河流水质演变的计算机模型。本文的目的是描述兵团流程解决AMD项目,呈现模型研究的结果,并解释如何将利益相关者共同合作,制定全面的计划,以解决在周一河流域的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号