首页> 外文会议>International Conference on Offshore Mechanics and Arctic Engineering >Shallow Water PEMEX Production Platform with Large Production Capacity in Cantarell
【24h】

Shallow Water PEMEX Production Platform with Large Production Capacity in Cantarell

机译:浅水纸拍生产平台,在Cantarell的大量生产能力

获取原文

摘要

Many pile mounted jacket type fixed platforms in shallow water have been installed during the last fifty years for producing oil. However, a production platform in 165 feet of water that produces 414,000 barrels of oil and 436 million standard cubit foot of gas per day (mmscfd) is not so common. In November 2003, such a platform has been installed by PEMEX (Petroleos Mexicanos) in the AKAL-L complex of Cantarell field located in the bay of Campeche. The Cantarell field development is a very high-profile development undertaken by PEMEX at a cost of more than USD10 billion. Although it is a shallow water platform, many design considerations are quite challenging because of the methods of construction, Ioadout, transportation, installation, etc. For example, the production deck of this installation weighs approximately 11,500 tonnes, including rigging. In the early stage of design, it required consideration of one-piece construction vs. multi-piece construction for cost effectiveness. The decision process included considerations of not only the capabilities of fabrication facilities, but also the availability and capacity of an installation/crane barge, such as the Saipem S-7000. The deck was finally constructed in five modules, one large 7000 tonnes module, and four smaller modules for generator and compressors each weighing approximately 900 tonnes. Proper planning of Ioadout, lifting operations and related engineering issues proved crucial to the successful installation of the platform. The deck of the platform was built in Dragados Offshore yard in Cddiz, Spain, and was then dry towed on a large deck cargo barge, S-44, owned by Saipem. The water level at the Ioadout dock site and range of tides in the area made it necessary to ground the S-44 during deck Ioadout. Grounding of the barge raised several engineering issues, such as, the adequacy of the barge structure during the Ioadout operation, preparation of the mudline at the dock, developing of a detailed ballasting sequence, inspection of barge structure before sail-away, etc. The transportation of the deck not only required proper design of seafastening structures, but also required verifying the structural integrity of the deck and other structures of the module. This paper presents an overview of the design features of the platform as well as the methods of Ioadout, transportation and installation.
机译:在过去五十年中,许多桩安装夹克型固定平台在生产油的最后五十年中安装。然而,在165英尺的水中生产平台,生产414,000桶油,每天4.36亿标准煤炭(MMSCFD)并不是那么常见。 2003年11月,在坎佩尔湾的Cantarell领域的Akal-L综合体中,Pemex(Petroleos Mexicanos)已经安装了这样的平台。 Cantarell Field Development是Pemex开展的非常高调的开发,费用超过10亿美元。虽然它是一个浅水平台,但由于施工,IOODOUT,运输,安装等方法,许多设计考虑因素非常具有挑战性。例如,该安装的生产甲板重量约为11,500吨,包括索具。在设计的早期阶段,需要考虑一体式结构与多件式结构进行成本效益。决策过程包括不仅考虑制造设施的能力,还包括安装/起重机驳船的可用性和容量,例如Saipem S-7000。甲板最终由五个模块构建,一个大型7000吨模块,以及用于发电机和压缩机的四个较小的模块,每种压缩机每次重约900吨。正确规划IOODOUT,提升业务和相关工程问题证明对平台的成功安装至关重要。该平台的甲板是在西班牙Cddiz的Dragados海上院子里建造,然后在Saipem拥有的大型甲板货物驳船,S-44上拖曳。 IoadOut码头站点的水位和该区域的潮汐范围使得在甲板Ioadout期间需要接地S-44。驳船的接地提高了几种工程问题,例如,驳船结构的充分性,在IoadOut操作期间,在码头的泥线准备,开发详细的压载序列,在帆船之前检查驳船结构等甲板的运输不仅需要适当的自燃结构设计,还需要验证甲板的结构完整性和模块的其他结构。本文概述了平台的设计特征以及IoadOut,运输和安装的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号