LEARNING CURVE MANAGEMENT ON CONSTRUCTION COST REDUCTION IN LNG STORAGE TANKS GESTION DE LA COURBE D'APPRENTISSAGE POUR L'EXECUTION DE LA CONSTRUCTION DE RESERVOIRS DE STOCKAGE DE GNL

机译:LNG储罐学习曲线管理施工成本减少曲线管理,用于执行GNL储存储层建设的曲线管理

获取原文

摘要

Unlike in other areas, construction performance and learning factor analysis in LNG tank construction have been limited, compared to their important roles in LNG facilities. The LNG tank construction cost is the largest single cost in a receiving terminal. The specific construction cost of LNG storage tanks have decreased with an increase in storage capacity. However, quantitatively utilizing the past experiences in cost estimation and profitability analysis was a long term unsettled task in LNG projects. Learning curve resources were accumulated by Kogas and KBR from three different types of storage tanks: membrane type aboveground tanks, 9% Nickel full containment storage tanks, and membrane type in-ground tanks (total 28 tanks, each type built at the same site). Case based construction analysis was performed in view of tank type, construction method, construction duration, accumulated experience, storage capacity, and other parameters that affect construction performance. This paper presents the effects of the Learning Curve Management (LCM) on construction performance and cost reduction based on past experiences. A re-learning factor is incorporated in the learning function and the ultimate level of performance has been implanted in the new model of the learning curve. This paper demonstrates that the LCM, derived from the case based construction analysis, provides a reasonable basis of cost analysis, cost estimation, and profitability studies, all of which are related to the evaluation of future costs and confidence level in an analysis.
机译:与其他领域不同,LNG坦克建设中的施工性能和学习因素分析受到限制,与液化天然气设施的重要作用相比。 LNG罐结构成本是接收终端中最大的单一成本。 LNG储罐的具体施工成本随着储存能力的增加而降低。然而,定量利用过去的成本估算和盈利能力分析的经验是LNG项目中的长期未定期的任务。学习曲线资源由Kogas和KBR从三种不同类型的储罐中累积:膜型地上坦克,9%镍完全储存储罐,和膜型内坦克(总共28个坦克,每种类型在同一地点建造) 。考虑到基于箱式,施工方法,施工持续时间,累积经验,存储容量和影响施工性能的其他参数进行的案例施工分析。本文介绍了学习曲线管理(LCM)对基于过去经验的施工绩效和成本降低的影响。在学习功能中并入重新学习因子,并且在学习曲线的新模型中植入了最终性能水平。本文表明,源自基于案例的施工分析的LCM为成本分析,成本估算和盈利能力研究提供了合理的基础,所有这些都与分析中未来成本和置信水平的评估有关。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号