The Corrib gas project:the deposition of 450,000 tonnes of peat

机译:CORRIB天然气项目:沉积45万吨泥炭

获取原文

摘要

As part of Shell's Corrib gas project to construct an onshore gas terminal at Bellanaboy,North-west Mayo,Ireland it was necessary to remove approximately 450,000 m3 of peat from the terminal footprint.The excavation works were carried out by a civil engineering contractor (Roadbridge Ltd.) and this excavated peat was then transported by a road haulier (Iggy Madden Transport Ltd.) a distance of 11km by road to a specially constructed deposition site owned and operated by Bord na Mona.This peat deposition site,where the removed peat was received,re-loaded for internal site haulage and finally placed,is located on industrial cutaway peatlands in Srahmore,near Bangor-Erris in Co.Mayo,Ireland.The peat deposition process was included as part of the planning application for Shell E&P Ireland Ltd (SEPIL) to construct a gas terminal for the reception and separation of gas from the Corrib gas field.The deposition was governed by numerous planning conditions,also separate conditions imposed as part of the waste licence as issued by the EPA.The peat was received at Srahmore and spread over low areas (bays) to depths of on average 1.4m - 1.8m.The deposited peat was then profiled allowing for water run off.Following deposition activities and the implementation of the agreed monitoring programme vegetation was allowed to establish naturally,primarily soft rush (Juncus effusus) as well as other native peatland species.The revegetation process was rapid and this helped in the stabilisation process leading to a very low risk to the overall stability of the deposited peat.
机译:作为贝壳的CORRIB天然气项目的一部分,在塞尔兰西北梅奥(Bellanaboy)建造陆上天然气码头,爱尔兰有必要从终端足迹中去除大约450,000 M3的泥炭。通过土木工程承包商进行了开挖工程(RoadBridge有限公司)然后通过道路运输(Iggy Madden Transport Ltd.)乘坐由Bord Na Mona的特殊构造和操作的沉积地点进行距离11km的挖掘泥炭距离。此泥炭沉积遗址收到,重新加载内部场地运输,最后放置,位于爱尔兰Co.Mayo的Bangor-Erris附近的Srahmore的工业Cutaway Peatlands。泥炭沉积过程作为Shell E&P爱尔兰的计划申请有限公司(SEPIL)来构造用于接收从该科里布气体field.The沉积气体的分离气体终端通过众多规划的条件下,还实行为PA分离条件的限制由EPA发布的废物许可证的RT。泥炭被在Srahmore收到,并在低地区(海湾)到平均为1.4米 - 1.8M的深度。然后,沉积的泥炭被允许水耗尽。沉积沉积允许活动和实施商定的监测方案植被,自然地建立,主要是柔软的冲击(Juncus Effusus)以及其他原生泥炭物种。恢复过程很快,这有助于稳定过程导致风险很低沉积的泥炭的整体稳定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号