首页> 外文会议>Beam Instrumentation Workshop >Beam Diagnostics for the BNL Energy Recovery Linac Test Facility
【24h】

Beam Diagnostics for the BNL Energy Recovery Linac Test Facility

机译:BNL能量回收LINAC测试设施的光束诊断

获取原文

摘要

An Energy Recovery Linac (ERL) test facility is presently under construction at BNL. The goals of this test facility are first to demonstrate stable intense CW electron beam with parameters typical for the RHIC e-cooling project (and potentially for eRHIC), second to test novel elements of the ERL (high current CW photo-cathode, superconducting RF cavity with HOM dampers, and feedback systems), and finally to test lattice dependence of stability criteria. Planned diagnostics include position monitors, loss monitors, transverse profile monitors (both optical and wires), scrapers/halo monitors, a high resolution differential current monitor, phase monitors, an energy spread monitor, and a fast transverse monitor (for beam break-up studies and the energy feedback system). We discuss diagnostics challenges that are unique to this project, and present preliminary system specifications. In addition, we include a brief discussion of the timing system.
机译:能量回收LINAC(ERL)测试设施目前正在BNL建设中。该测试设施的目标首先是展示稳定的强烈CW电子束,为RARIC电子冷却项目(潜在的ERHIC)具有典型的参数,第二是测试ERL的新颖元素(高电流CW光阴极,超导RF具有HOM阻尼器的腔和反馈系统),最后测试稳定标准的格子依赖性。规划诊断包括位置监视器,损耗监视器,横向型材监视器(光线和电线),刮刀/光环监视器,高分辨率差分电流监视器,相位监视器,能量扩展监视器和快速横向监视器(用于梁分手研究和能量反馈系统)。我们讨论该项目独有的诊断挑战,并呈现初步系统规格。此外,我们还包括关于定时系统的简要讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号