首页> 外文会议>Abu Dhabi International Petroleum Exhibition and Conference >The Benefits of Cold-Work in Middle Eastern Brownfield Projects and High Pressure Subsea Piping Operations
【24h】

The Benefits of Cold-Work in Middle Eastern Brownfield Projects and High Pressure Subsea Piping Operations

机译:中东棕色地区工程和高压海底管道运营中的冷轧效益

获取原文

摘要

Two of the biggest drivers in Middle East oil & gas operations today are the continued development and upgrade of existing facilities (Brownfield Projects) and the challenges involved in developing high pressure, high temperature (HP/HT) fields. These developments come with very different piping and pipeline challenges. In the case of Brownfield projects, it is the ageing piping installations with increased corrosion and leaks, and the need to carry out piping modifications while continuing production. And in the case of HP/HT developments, the challenges include the need to develop robust and effective instrumentation, reliable connections, reduce subsea intervention costs, and operate around existing infrastructure. This paper will look at how cold-work piping connection solutions can accommodate the challenges involved in Brownfield projects and HP/HT applications, as well as alleviating concerns over traditional methods, such as welding. Such concerns include time, cost, resources, and safety implications. Referring to the experience gained from installing over 3,000 cold-work connections worldwide, this paper will examine how cold-work solutions generate a simple mechanical connection; the technology of using hydraulic pipes to flange expansion in developing leak-free connections; the importance of no gasket, seals or moving parts in the connection; and the flexibility needed to handle a range of piping diameters. The paper will provide an example of a recent topside cold-work installation offshore Abu Dhabi – on a field in production for more than 40 years, where the cold-work piping technology was found to significantly reduce the traditional work scope. It will also provide an overview of the choices in taking the technology subsea and applications for critical, high pressure applications through recent testing with Petrobras in Brazil The paper will provide an important technical contribution to Middle Eastern operators in the form of i) a low impact and flexible piping solution that reduces production shut-down time; ii) increased safety; and iii) introduce significant financial savings.
机译:在中东的石油和天然气业务今天最大的驱动程序中的两个是持续发展和升级现有设施(棕地项目),并参与开发高压,高温(HP / HT)领域所面临的挑战。这些发展都具有非常不同的管道和管道的挑战。布朗菲尔德项目的情况下,增加的腐蚀和泄漏,需要进行管道修改,同时继续生产的老化管道的安装。而在HP / HT发展的情况下,所面临的挑战包括需要发展强大和有效的检测仪器,可靠的连接,降低海底干预成本和运营围绕现有的基础设施。本文将着眼于冷作管道连接解决方​​案如何适应参与棕地项目和HP / HT的应用,以及比传统方法减轻问题,如焊接的挑战。这种担忧包括时间,成本,资源和安全的影响。参照来自世界各地安装了3000冷连接工作取得的经验,本文将探讨冷作解决方案如何生成一个简单的机械连接;使用液压管到凸缘在显影无泄漏连接膨胀技术;没有垫片,密封件,或在连接的移动部件的重要性;和柔韧性需要处理的范围内的管路的直径。本文将提供最近的顶面冷安装工作阿布扎比海上的一个例子 - 在生产领域超过40年,其中冷作管道技术被发现显著减少传统工作范围。它还将提供的选择的概述中采取技术海底和应用的关键,高压应用通过近期与巴西国家石油公司测试在巴西本文将在我的形式提供给中东的运营商一个重要的技术贡献)影响小和柔性管道的解决方案,降低了生产停机时间; ⅱ)提高的安全性;和iii)介绍显著节省资金。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号