Effect of ‘Artificial Islands’ on Structural Integrity Management of Existing Offshore Platforms- Case Study

机译:“人工岛”对现有海上平台结构完整性管理的影响 - 案例研究

获取原文

摘要

Four 'artificial islands' are being constructed in Giant Offshore Field in Abu Dhabi, for the purpose of using as centers for drilling and oil production. ZADCO carried out extensive studies to assess the effect of these 'artificial islands' on the existing field facilities, such as offshore jacket platforms and pipelines, as these 'islands' would permanently alter the estuaries / topographies of the offshore fields. Studies clearly established that these 'alteration' does influence the long term / short term hydrodynamic forces on the existing offshore facilities thus affecting ZADCO's structural integrity management plan. Therefore, it was important to quantify the extent of these changes on the existing jacket platforms such that appropriate modification to the current plan can be implemented. The present case study attempts to address the above issue by analyzing two representative jacket platforms, out of numerous platforms. SACS structural analysis software has been utilized for the analysis of these two platforms using hydrodynamic models developed for the two cases: (1) before the construction of artificial islands and (2) after the construction of 'artificial islands'. Inplace, Fatigue and Pushover cases are part of major parameters used for the structural integrity of the offshore jacket platforms and the results of these analyses are part of critical input to the structural integrity management plans. It was observed that there were significant changes to the result of these analyses due to the introduction of artificial islands especially for the platforms which are having marginal reserve strength. This, in effect, alters current plan of inspection for critical nodes and members which need to be regularly inspected / monitored. It is also observed that the platforms pile on the mudline need to be inspected more frequently to know whether there are any changes to scouring of piles in soil. As a result of this case study it was established that such studies need to be performed while planning 'artificial islands' like facilities in offshore field like areas in order to asses its effect on existing facilities.
机译:四个“人造群岛”正在阿布扎比的巨型近海领域建造,以便用作钻井和石油生产中心。萨达科进行了广泛的研究,以评估这些“人工岛屿”对现有现场设施的影响,例如离岸夹克平台和管道,因为这些“岛屿”将永久改变海上域的河口/地形。明确确定这些“改变”确实影响了对现有的海上设施的长期/短期流动力,从而影响了Zadco的结构完整性管理计划。因此,重要的是要计算现有夹克平台的这些变化的程度,以便可以实施对当前计划的适当修改。本案例研究试图通过分析两个代表夹克平台,从许多平台中分析出面的问题。 SACS结构分析软件用于分析这两个平台,使用为这两种情况开发的流体动力学模型:(1)在建造“人工群岛”建设后的人工群岛和(2)之前。疲劳和推送案件是用于近海夹克平台结构完整性的主要参数的一部分,这些分析的结果是对结构完整性管理计划的关键输入的一部分。据观察,由于引入人工岛,因此对具有边缘储备强度的平台的平台,这些分析的结果存在显着变化。这实际上,改变了需要定期检查/监测的关键节点和成员的当前检查计划。还观察到,泥线上的平台需要更频繁地检查,以了解土壤中桩的冲洗是否有任何变化。由于这种情况研究,建立了需要进行这些研究,同时规划在海上场地中的“人工岛屿”等设施,如区域,以便判断其对现有设施的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号