首页> 外文会议>Abu Dhabi International Petroleum Exhibition and Conference >Maximising the Life of Corroding Tubing by Combining Accurate Multi- Finger Caliper Data with Corrosion Modelling
【24h】

Maximising the Life of Corroding Tubing by Combining Accurate Multi- Finger Caliper Data with Corrosion Modelling

机译:通过将精确的多指状卡钳数据与腐蚀建模相结合来最大化腐蚀管的寿命

获取原文

摘要

The purpose of this paper is to discuss the relationship and value brought by empirical field data measurement, extensive interpretation and analysis of that measured field data and powerful predictive modelling with the input of multiple production parameters, for the prediction of rate of corrosion in downhole completions. This paper involves studies conducted upon Tullow Oil’s Bangora Field in Block 9, Bangladesh. Compositional analysis of the gas produced from discovery well Bangora 1 identified CO2 as being present at a concentration of around 0.6 mol%. Initial corrosion modelling highlighted that carbon steel completions were not suitable for long term production in this environment, however carbon steel completions were installed for logistical reasons and a corrosion monitoring programme utilising multi-finger caliper surveys was put in place. These surveys identified extensive corrosion of production tubing within a short period of production. Accurately calibrated multi-finger sensor measurement was performed and repeated four times within a 2 year timeframe by Read Well Services. Intetech Ltd was engaged to carry out detailed corrosion modelling and prediction with input parameters including fluid production rates, well head and bottom hole pressures and temperatures and produced fluids composition. This modelling and direct measurement of the corrosion rates showed a good level of agreement and have given confidence to the life of the completion in relation to the rate of corrosion before expected failure. The technical benefit of this work has been that it has reduced the risk that a tubing leak arises, which would require the well to be shut-in resulting in significant deffered production and associated loss of revenue while waiting mobilization of workover equipment. Cost savings have arisen by being able to safely defer the time to workover of the wells in a location where workover equipment is not readily available and to reduce the frequency of caliper surveys. Tubing replacement is planned at as late a date as possible consistent with the modelling predictions, thus maximising the useful life of the string.
机译:本文的目的是讨论经验现场数据测量所带来的关系和价值,对测量现场数据的广泛解释和分析,与多种生产参数的输入,用于井下完井中的腐蚀速率预测。本文涉及在孟加拉国街区的Tullow石油班兰领域进行的研究。由Discovery井Bangora1产生的气体的组成分析1鉴定为浓度约为0.6mol%的CO 2。初始腐蚀建模突出显示,碳钢完成不适合在这种环境中长期生产,但是安装了物流原因的碳钢完成,并建立了利用多指卡钳调查的腐蚀监测计划。这些调查在短时间内确定了生产管道的广泛腐蚀。通过读取井服务在2年间隔内进行准确校准的多指传感器测量并重复四次。 Intetech Ltd正在参与对输入参数进行详细的腐蚀建模和预测,包括流体生产速率,井头和底部空穴压力和温度并产生流体组合物。这种建模和直接测量腐蚀率显示出良好的协议水平,并对预期失败前的腐蚀速度有信心。这项工作的技术好处是它降低了出现了管道泄漏的风险,这将需要良好的井,从而在等待机械设备的调动时产生显着的脱次生产和收入损失。通过能够安全地将成本节省储蓄,可以安全地推迟到工作台设备不容易获得的位置,并减少卡钳调查的频率。在与建模预测中尽可能符合建模预测的日期,换气管更换,从而最大化串的使用寿命。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号