Launch Vehicle Development Risk Projection Methodology

机译:发动车辆开发风险投影方法

获取原文

摘要

A launch vehicle risk projection analysis is discussed, which produces an estimation of reliability and failure risk for future launch vehicle designs. The estimation is based on what is known at a given time about the vehicle configurations, their launch manifest, and the heritage of the major components that make up each configuration, including the actual flight record of such components in earlier launch vehicle families. The approach produces an initial risk projection for a new launch vehicle family and its subsequent evolution in time. The latter can be based on the "mix" of vehicle configurations that appear in a vehicle family launch manifest and the record of launches of each configuration, as they occur in time.
机译:讨论了发射车风险投影分析,从而产生了对未来发射车辆设计的可靠性和故障风险的估算。估计基于关于车辆配置的给定时间所知的内容,其发射清单以及构成每个配置的主要组件的遗产,包括早期发射车辆家庭中这些组件的实际飞行记录。该方法为新的发射车辆家族及其随后的演变产生了初始风险投影。后者可以基于车辆系列中出现的车辆配置的“混合”,以及每个配置的发射记录,因为它们及时发生。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号