Design and construction of impervious system in foundation of Yele embankment dam

机译:Yele路堤水坝基础上的防范系统的设计与施工

获取原文

摘要

Yele Dam is the highest embankment dam (125.5 m) with asphalt concrete wall in Asia, located in the Nanya River in Sichuan Province south west of China, and is under construction. Due to the complicated geologic condition and high earthquake intensity (VIII), there are a lot of particular difficulties in design and construction of the foundation treatment. Yele Dam is placed on the highly asymmetrical ground bed. Its left abutment is on the quartz diorite, but the main body and the right abutment as well as the right upland plain is on the loam and sandy gravel interbedded strata with the depth of more than 420 m. To control the seepage of the foundation, compositive measurements in design have been adopted. From left to right, the curtain grouting in rock (left grouting gallery), cut-off wall plus lower curtain grouting in rock (left abutment), cut-off wall (in bed and right abutment) and cut-off wall plus lower curtain grouting (in the right bank upland plain) are used. The upland plain cut-off wall is 140 meters deep and is divided into two parts, the upper wall and the lower wall, connected by a construction gallery functioning as the work place to build the lower wall and the lower curtain grouting. The lower curtain grouting is 60 meters deep beneath the bottom of the lower cutoff wall, so the total depth of seepage control is 200 meters. To build the cut-off walls in so deep overburden foundation, some difficulties must be resolved, such as bentonite slurry stable wall, hole deviation control and ring budding of the adjacent holes as well as the choose of proper drill machines (the twin wheels milling machine, chopping drill, and hammer drill with reverse circulation are adopted in different geologic condition). To execute the grout curtains, some difficulties such as the proper drilling equipment, the grouting pressure, water cement ratio, quality inspection and acceptance criterion, etc must be overcome. Yele Dam and the power house will be completed and put into production in 2005. The total acreage of cut-off walls in the dam is 55000m~2, in which 30000m~2 has been completed and the tests demonstrated that results were satisfactory. This paper will detailedly describe the successful options in the design and construction of foundation treatment of Yele Dam.
机译:Yele Dam是亚洲最高的堤防大坝(125.5米),位于中国四川南南南南南亚河的亚洲亚洲,正在建设中。由于地质条件复杂和高地震强度(VIII),对基础治疗的设计和构建有很多特殊的困难。 Yele Dam放置在高度不对称的地面床上。它的左基台正处于石英二极管,但主体和正确的基台以及右上国的底片以及底部和砂岩砾石互磨的地层,深度超过420米。为了控制基础的渗漏,已经采用了设计中的集成测量。从左到右,窗帘灌浆在岩石(左灌浆画廊),截止墙加上岩石(左基台),切断墙(卧床和右基台)和截止墙加上下帘使用灌浆(在右岸普通平原中)。普通普通剪切墙深140米,分为两个部分,上墙和下墙,通过建筑画廊连接作为建造下墙和下帘灌浆的工作场所。下窗帘灌浆在下部截止墙的底部深处60米,因此渗流控制的总深度为200米。为了建造如此深的覆盖层基础的截止墙,必须解决一些困难,如膨润土浆料稳定的墙壁,孔偏差控制和相邻孔的振铃芽以及适当的钻孔机(双轮铣削具有反向循环的机器,斩波和锤钻在不同的地质条件下采用。为了执行灌浆窗帘,必须克服诸如适当的钻井设备,灌浆压力,水水泥比,质量检测和验收标准等一些困难。 Yele Dam和Power House将于2005年完成并投入生产。大坝中截止墙的总面积为55000m〜2,其中30000m〜2已经完成,测试表明结果令人满意。本文将详细说明叶利坝基础处理的设计和构建成功选择。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号