Design and construction of impervious system in foundation of Yele embankment dam

机译:冶勒河堤坝基础防渗系统的设计与施工

获取原文
获取原文并翻译 | 示例

摘要

Yele Dam is the highest embankment dam (125.5 m) with asphalt concrete wall in Asia, located in the Nanya River in Sichuan Province south west of China, and is under construction. Due to the complicated geologic condition and high earthquake intensity (VIII), there are a lot of particular difficulties in design and construction of the foundation treatment. Yele Dam is placed on the highly asymmetrical ground bed. Its left abutment is on the quartz diorite, but the main body and the right abutment as well as the right upland plain is on the loam and sandy gravel interbedded strata with the depth of more than 420 m. To control the seepage of the foundation, compositive measurements in design have been adopted. From left to right, the curtain grouting in rock (left grouting gallery), cut-off wall plus lower curtain grouting in rock (left abutment), cut-off wall (in bed and right abutment) and cut-off wall plus lower curtain grouting (in the right bank upland plain) are used. The upland plain cut-off wall is 140 meters deep and is divided into two parts, the upper wall and the lower wall, connected by a construction gallery functioning as the work place to build the lower wall and the lower curtain grouting. The lower curtain grouting is 60 meters deep beneath the bottom of the lower cutoff wall, so the total depth of seepage control is 200 meters. To build the cut-off walls in so deep overburden foundation, some difficulties must be resolved, such as bentonite slurry stable wall, hole deviation control and ring budding of the adjacent holes as well as the choose of proper drill machines (the twin wheels milling machine, chopping drill, and hammer drill with reverse circulation are adopted in different geologic condition). To execute the grout curtains, some difficulties such as the proper drilling equipment, the grouting pressure, water cement ratio, quality inspection and acceptance criterion, etc must be overcome. Yele Dam and the power house will be completed and put into production in 2005. The total acreage of cut-off walls in the dam is 55000m~2, in which 30000m~2 has been completed and the tests demonstrated that results were satisfactory. This paper will detailedly describe the successful options in the design and construction of foundation treatment of Yele Dam.
机译:冶勒水坝是亚洲最高的堤防大坝,有沥青混凝土墙,位于中国西南部的四川省南亚河,目前正在建设中,该堤坝为125.5 m。由于复杂的地质条件和较高的地震烈度(VIII),在基础处理的设计和施工中存在许多特别的困难。 Yele大坝放置在高度不对称的地面上。它的左基台在石英闪长岩上,但主体和右基台以及右高地平原在壤土和砂砾砾石夹层中,深度超过420 m。为了控制基础的渗流,在设计中采用了综合测量。从左到右,岩石中的帷幕灌浆(左灌浆廊),防渗墙加上岩石中的下部帷幕灌浆(左基台),防渗墙(在床和右基台中)和防渗墙加上下部帷幕使用灌浆(在右岸高地平原)。高地平原防渗墙深140米,分为上墙和下墙两部分,并由一个建筑廊连接,该建筑廊用作建造下墙和下幕墙的工作场所。下幕灌浆在下挡土墙底部下方60米深处,因此防渗总深度为200米。要在如此深的覆盖层基础上建造防渗墙,必须解决一些难题,例如膨润土泥浆稳定的墙,控制孔偏斜和相邻孔的环芽以及选择合适的钻床(双轮铣削)。机,切碎钻和反钻锤钻在不同的地质条件下使用。为了进行灌浆帷幕,必须克服一些困难,例如适当的钻探设备,灌浆压力,水灰比,质量检查和验收标准等。冶勒大坝及动力厂房将于2005年建成投产。大坝防渗墙总面积55000m〜2,已完成30000m〜2,试验表明效果令人满意。本文将详细介绍Yele大坝基础处理设计和施工中的成功选择。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号