首页> 外文会议>International Conference on Engineering Computational Technology >Safety in the Demobilization and Early Occupancy of High-Rise Buildings
【24h】

Safety in the Demobilization and Early Occupancy of High-Rise Buildings

机译:复员的安全和高层建筑的早期入住

获取原文

摘要

In the case that occupancy begins before construction is complete, the occupants of high-rise commercial and residential buildings are unintentionally involved in a risky situation as a result of zone overlap. A fault tree model is developed to explain the causes of injury to occupants and labourers. This model shows the structure of causal relationships from the top event of failure, which is occupant or labourer injury, to the primary events or causes of the failure. It is comprised of three sub-models which represent injury to occupants due to unsafe stationary activity (unsafe site conditions), injury to occupants due to construction activity, and injury to labourers due to construction activity. The causes of each sub-model are expanded to their respective primary causes. The qualitative analysis of Minimal Cut Sets (MCS) is used to summarize the combinations of basic events that may contribute to the occurrence of the top event.
机译:在占用速度开始之前占用的情况下,由于区域重叠,高层商业和住宅建筑物的乘员无意中涉及风险状况。开发了一个故障树模型,以解释占用者和劳动者的伤害原因。该模型显示了从失败的最终事件的因果关系的结构,即乘员或劳动者伤害,对失败的主要事件或原因。它由三个子模型组成,该子模型代表由于不安全的静止活动(不安全的场地条件),由于施工活动而导致占用者的伤害,并且由于施工活动而受到劳动者的伤害。每个子模型的原因扩展到它们各自的主要原因。最小剪切集(MCS)的定性分析用于总结可能有助于最佳事件发生的基本事件的组合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号