首页> 外文会议>International Conference on Fluvial Hydraulics >Numerical groyne layout optimisation for restoration projects in large rivers: An adaptive approach towards a desired morphodynamic equilibrium
【24h】

Numerical groyne layout optimisation for restoration projects in large rivers: An adaptive approach towards a desired morphodynamic equilibrium

机译:大型河流恢复项目的数值GROYEN布局优化:一种适应性均衡的自适应方法

获取原文

摘要

Integrative restoration measures at large rivers target the improvement of morphological and ecological conditions, under consideration of economic demands, specifically navigational ones. Alternative groyne layouts with e.g. reduced groyne spacing and lowered crest elevation reduce ecological deficits and have the potential to cease frequently encountered river bed incision of heavily modified rivers. On the other hand, the induced change in the morphodynamic equilibrium may interfere with navigation by reducing the water depth in the fairway. In 2009, a pilot project was realised on the Austrian Danube, including an alternative groyne layout. As a consequence the desired aggradations in the fairway became too large, leading to an increased dredging effort. In 2014, a numerical groyne optimisation, specifically a 3D numerical model in combination with a sediment transport model, was applied. In 2015, after implementing the optimised groyne layout in the field, morphodynamic equilibrium was reached reducing the need of extensive dredging. This equilibrium could be shown by analysing subsequently observed bathymetries until 2017. Moreover, the morphodynamic changes due to the groyne optimisation in 2015 were reproduced successfully with the numerical models. Thus they represent a cost effective tool for planning and optimising future restoration measures in large and heavily modified rivers.
机译:大型河流的综合恢复措施旨在改善形态学和生态条件,在考虑经济需求,特别是导航的过程中。替代Groyne布局,例如减少林克斯间距和降低嵴高程降低了生态缺陷,并有可能停止经常遇到的河床切口严重修改的河流。另一方面,通过减少球道中的水深来干扰形态动力学平衡的诱导变化可能会干扰导航。 2009年,在奥地利多瑙河上实现了一项试点项目,包括替代格洛涅布局。因此,球道中所需的委员会变得太大,导致疏浚努力增加。 2014年,应用了数值GROYNE优化,特别是与沉积物传输模型组合的3D数值模型。 2015年,在实施该领域的优化林恩布局之后,达到了形势均衡,降低了广泛疏浚的需要。通过分析随后观察到的碱基测定,可以显示这种平衡,直到2017年。此外,2015年Groyne优化导致的形态学变化是用数值模型成功复制的。因此,它们代表了一个成本效益的工具,用于规划和优化大型和重型修改河流的未来恢复措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号