首页> 外文会议>Air Waste Management Association Annual Conference Exhibition >Understanding the Implications of the General Conformity Rule for Marine Dredging Projects
【24h】

Understanding the Implications of the General Conformity Rule for Marine Dredging Projects

机译:了解船舶疏浚项目的一般符合性规则的影响

获取原文

摘要

The Clean Air Act provides the foundation for implementing general conformity in seaports by requiring that federal actions are prohibited from contributing to any new violations or to the frequency or severity of any existing violations of ambient air quality standards in a non-attainment or maintenance area. The U.S. Army Corps of Engineers (Corps) is the federal agency responsible for overseeing seaport dredging projects. With the increased demand for international commodities to be shipped to the United States, there is a need to increase the size of the container ships. These larger ships require increasing the depths of shipping channels and berthing areas in seaports. Recent seaport dredging projects have required the Corps to conduct general conformity analyses during the environmental impact assessment and permitting process. The Corps may demonstrate conformity for a project by showing that direct and indirect project emissions are already included in an EPA-approved state implementation plan (SIP).For projects not included in the SIP, a formal general conformity determination may be required if incremental project-related emissions of any applicable pollutant exceed de minimis levels, or if the project is considered “regionally significant,” where incremental project-related emissions of any applicable pollutant are greater than ten percent of the emissions inventory for the non-attainment or maintenance area for that pollutant. A formal determination is required to demonstrate how the proposed project conforms with the purposes of the SIP before the Corps can issue a dredging permit.
机译:“清洁空气法”为通过要求联邦行动在非达达或维护区域中的任何新违规行为或任何现有的环境空气质量标准的频率或严重程度促使联邦行动,为海港实施一般符合行动的基础。美国军队的工程师(Corps)是联邦机构负责监督海港疏浚项目。随着对国际商品的需求增加,需要增加集装箱船的大小。这些较大的船舶需要增加海港的航运渠道和停泊区域的深度。最近的海港疏浚项目已经要求军团在环境影响评估和允许过程中进行一般符合性分析。欧洲军团可以通过表明已经包含在EPA批准的国家实施计划(SIP)中包含的直接和间接的项目排放来证明项目的一致性。如果增量项目未包含在SIP中,则可能需要正式的一般符合性确定 - 任何适用的污染物的排放超过了最小程度,或者如果项目被认为是“地区重要的”,那么任何适用的污染物的增量项目相关排放量大于不可达到或维护区域的排放量的百分之十对于那个污染物。需要正式的确定来证明拟议项目如何符合SIP的目的,并在军团发出疏浚许可之前。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号