首页> 外文会议>IAHR congress >FIELD OBSERVATION ON THE RCC STEPPED SPILLWAYS WITH THE FLARING PIER GATE ON THE DACHAOSHAN PROJECT
【24h】

FIELD OBSERVATION ON THE RCC STEPPED SPILLWAYS WITH THE FLARING PIER GATE ON THE DACHAOSHAN PROJECT

机译:在Dachaoshan项目上的喇叭形码头门对RCC阶梯式溢洪道的田间观察

获取原文

摘要

The Dachaoshan Project has adopted the flaring pier gates on the surface spillway, a small flip bucket at the end of the pier and a stepped spillway combined with RCC construction techniques on the main dam. The hydraulic field observation was made in June 2002 with the design reservoir water level and mainly concentrated on the pressures, velocities and aeration concentrations on four steps. Operation experiences for a dam height over 100 m and unit width discharge over 165 m~3/s/m were achieved by this project. The observation results show that a small flip bucket 2 meters high is very effective to let the trajectory flow away from steps and ensure enough aeration between the bottom of flow and steps.
机译:达越山项目采用了地表溢洪道上的喇叭形墩盖,在码头末端的小拖延桶,并将阶梯式溢洪道与主要大坝的RCC施工技术相结合。液压场观察是在2002年6月进行的,设计储层水位,主要集中在四个步骤中的压力,速度和通气浓度。该项目实现了超过100米和单位宽度放电超过100米的坝高的操作经验,通过该项目实现了超过165 m〜3 / s / m。观察结果表明,2米高的小跳片非常有效地让轨迹远离步骤流动,并确保流量和步骤的底部之间足够的曝气。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号