首页> 外文会议>Conference of the Australian Society of Sugar Cane Technologists >MODIFICATION TO THE EVAPORATOR STATION IN PREPARATION FOR A CO-GENERATION FACTORY AT BROADWATER MILL
【24h】

MODIFICATION TO THE EVAPORATOR STATION IN PREPARATION FOR A CO-GENERATION FACTORY AT BROADWATER MILL

机译:蒸发器站的修改为Broadwater Mill制备制备工厂工厂

获取原文

摘要

Broadwater Sugar Mill commissioned a 4000 m~2 SRI-designed Roberts evaporator for the 2002 crush. The evaporator is the crucial first stage of a cogeneration plant, which will comprise a high-pressure boiler and turbo-alternator producing renewable electrical energy for sale. To achieve this, steam consumption by all process plant will need to be minimised and condensate quality for boiler feed water will need to be guaranteed. This paper describes the installation, control system and operating performance of the new SRI Roberts evaporator and the associated arrangement of vapour bleeding to pans and heaters used to optimise the steam efficiency in the 2002 season.
机译:Broadwater Sugar Mill委托了4000米〜2 SRI设计的罗伯特蒸发器,用于2002年挤压。蒸发器是热电联产厂的关键第一阶段,其包括高压锅炉和涡轮交流发电机,生产可再生电能进行销售。为此,需要最小化所有加工厂的蒸汽消耗,并且需要保证锅炉饲料水的冷凝质量。本文介绍了新SRI Roberts蒸发器的安装,控制系统和操作性能以及用于在2002季度优化蒸汽效率的平底锅和加热器的蒸气流放的相关布置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号