首页> 外文会议>2003 Conference of the Australian Society of Sugar Cane Technologists: Abstracts >MODIFICATION TO THE EVAPORATOR STATION IN PREPARATION FOR A CO-GENERATION FACTORY AT BROADWATER MILL
【24h】

MODIFICATION TO THE EVAPORATOR STATION IN PREPARATION FOR A CO-GENERATION FACTORY AT BROADWATER MILL

机译:修改废水处理厂的蒸发站,以制备废水处理厂

获取原文
获取原文并翻译 | 示例

摘要

Broadwater Sugar Mill commissioned a 4000 m~2 SRI-designed Roberts evaporator forrnthe 2002 crush. The evaporator is the crucial first stage of a cogeneration plant, whichrnwill comprise a high-pressure boiler and turbo-alternator producing renewable electricalrnenergy for sale. To achieve this, steam consumption by all pr℃ess plant will need to bernminimised and condensate quality for boiler feed water will need to be guaranteed. Thisrnpaper describes the installation, control system and operating performance of the newrnSRI Roberts evaporator and the ass℃iated arrangement of vapour bleeding to pans andrnheaters used to optimise the steam efficiency in the 2002 season.
机译:Broadwater制糖厂投产了由SRI设计的4000 m〜2 Roberts蒸发器,用于2002年的压榨。蒸发器是热电联产工厂至关重要的第一阶段,该阶段将包括高压锅炉和涡轮发电机,产生可出售的电能。为此,必须降低所有工厂的蒸汽消耗,并需要保证锅炉给水的冷凝水质量。本文介绍了新型rnSRI Roberts蒸发器的安装,控制系统和运行性能,以及将锅底加热器的蒸汽渗出的相关布置,以优化2002年度的蒸汽效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号