首页> 外文会议>World Mining Congress vol.1 >New Approach to Evaluation of a Low Grade Iron-ore Deposits in Turkey
【24h】

New Approach to Evaluation of a Low Grade Iron-ore Deposits in Turkey

机译:评估土耳其低等铁矿矿床的新方法

获取原文

摘要

The re-evaluation of the ore reserves with the help of several computer programs, the development of a process flow sheet in the light of new technologies, the preparation of the new pre-exploitation program and locating a new plant site are the main points established in this project. According to the overall results, the Hasancelebi iron-ore deposit has 3.2 billion tons of geological reserve and the eastern ore body subjected to the new plant possesses 94 million tons of exploitable reserve and therefore has an important place as a mining site in our country. 7.5 million tons per year ROM ore and 1.5 million tons per year pellet production containing 69% Fe with a 83% Fe_3O_4 recovery basis was set up during the 14 years, mine activity. Total investment cost is calculated to be around 145 million US dollar with the consideration of the need for 183 employment positions. The results obtained from this study for the Hasancelebi iron-ore deposit indicate positive signs for the implementation of this investment project. However, it can be concluded that final feasibility and evaluation must begin without any delay.
机译:在几个计算机程序的帮助下重新评估矿石储备,鉴于新技术的过程流程表的开发,制定新的剥削计划和定位新工厂网站是建立的要点在这个项目中。根据整体成果,Hasancelebi铁矿矿床拥有32亿吨地质储存,遭受新工厂的东部矿石拥有9400万吨的可利用储备,因此拥有我国采矿现场的重要场所。每年750万吨ROM ORE和每年150万吨颗粒生产占83%FE恢复的69%FE,在14年,矿山活动中设立了83%FE_3O_4恢复基础。由于需要183个就业职位,计算总投资成本约为1.45亿美元。从本研究中获得的结果为缺铁矿床,表明该项目实施的积极迹象。但是,可以得出结论,最终可行性和评估必须开始没有任何延迟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号