首页> 外文会议>International Conference on Fluidized Bed Combustion >THE LARGEST CFB BOILER (440T/H) IN CHINA AND POWER STATION DESIGN
【24h】

THE LARGEST CFB BOILER (440T/H) IN CHINA AND POWER STATION DESIGN

机译:中国和电站设计中最大的CFB锅炉(440t / h)

获取原文

摘要

Xinxiang Thermal Power Plant Construction Project adopts the first largest set of CFB boiler. The paper makes an introduction to its characteristics in practical use. The boiler has the proper construction, advanced technique, complete function and reliable operation after technological improvements in abrasion proof, desulfurizing, jellaba, high-temperature cyclone separator, ash cooler and combustor. The paper also discuss on the unfeasible side bunker program, optimum design on span of deaerator and coal bunker bay, no adoption of independent control building and whole platform on the operating floor of boiler, no enclosure below boiler operating floor in detail. It greatly decreased the project cost on the premise of safety and economic operation.
机译:新乡火电厂建设项目采用第一组最大的CFB锅炉。本文在实际使用中介绍了其特征。锅炉具有适当的施工,先进的技术,功能和可靠的耐磨技术改进后的操作,脱硫,吉尔巴,高温旋风分离器,灰冷却器和燃烧器。本文还讨论了不可行的侧面地区,跨越煤炭和煤炭湾跨度的最佳设计,不采用锅炉运行楼层的独立控制建设和整个平台,详细铺设锅炉下面的外壳。在安全和经济运行的前提下,它大大降低了项目成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号