首页> 外文会议>European Simulation Symposium >VALIDATING THE PRODUCTION WEEKLY PLAN BY SCHEDULING SIMULATION
【24h】

VALIDATING THE PRODUCTION WEEKLY PLAN BY SCHEDULING SIMULATION

机译:通过调度模拟验证生产每周计划

获取原文

摘要

Large Corporate and Small and Medium Enterprises are still going through deep innovation and re-engineering processes. Organisation should became leaner and more efficient. Even planning and scheduling should be integrated in order to yield feasible and robust plan in an automatic way by continuous planning, from forecasting to daily line load. We present a framework for weekly plan validation with respect to all the production constraints based on scheduling simulation and apply it in a real case involving the world-wide leader in Medication Delivery market.
机译:大型企业和中小企业仍然经历深入的创新和重新工程流程。组织应该变得更加壮大,更高效。甚至规划和调度应集成,以便通过连续规划以自动规划产生可行和强大的计划,从预测到日常线路负荷。我们为每周计划验证提供了一个关于根据调度模拟的所有生产限制的计划验证框架,并在涉及涉及世界各地的药物交付市场领导者的真正案例中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号