Open cast production of lignite at Cirikovac deposit started on 1973. Cirikovac opencast is a part of Kostolac mine, located 60 km South of Belgrade. Lignite from this opencast is primarily consumed by thermal power plant, with installed power of 309 MW. Existing problems present at Cirikovac opencast led to development of Programme for mine closure until the end of 2009. Detailed analysis of possibility for application of underground mining was performed, since considerable reserves still exists in this deposit (136 Mt), with favourable geological conditions. Analysis included all relevant factors which should provide information for technical, technological and operational parameters, as well as for economics, enabling feasibility evaluation of underground coal mining at Cirikovac deposit. This paper presents results achieved with mentioned analysis, which proved that highly productive longwall mining with 2 Mtpa can be successfully implemented, regarding technical and technological conditions, economics and environment protection.
机译:在1973年开始,Cirikovac押金开放铸造Lignite。Cirikovac Opencast是Kostolar Mine的一部分,位于贝尔格莱德以南60公里处。来自这种露品的褐煤主要由火电厂消耗,安装功率为309兆瓦。 Cirikovac Opencast的现有问题导致矿井封闭计划的开发,直到2009年底。进行了应用地下采矿的可能性的详细分析,因为本矿床(136吨)仍然存在相当大的储备,具有良好的地质条件。分析包括所有相关因素,应提供技术,技术和运营参数的信息,以及经济学,使Cirikovac押金的地下煤矿可行性评估能够进行可行性评估。本文提出了通过提到的分析所取得的结果,这证明,可以成功实施具有2个MTPA的高效的Longwall采矿,而是可以成功实施技术和技术条件,经济学和环境保护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号