首页> 外文期刊>Surface Mining - Braunkohle and Other Minerals >Application of modern mining equipment in a lignite opencast mine in the Czech Republic
【24h】

Application of modern mining equipment in a lignite opencast mine in the Czech Republic

机译:现代采矿设备在捷克褐煤露天矿中的应用

获取原文
获取原文并翻译 | 示例
           

摘要

Under its modernization programme of the mining equipment, Severoceske doly ordered one spreader and two bucket wheel excavators from a joint venture formed by Prodeco and ThyssenKrupp Fordertechnik. The spreader went into operation in 2000 (Figure 4). The first bucket wheel exscavator was commis-sioned into operation in May 2002 (Figures 5 and 6). The design for the second bucket wheel excavator was started in October 2002. In the meantime. Severoceske doly has placed another order with the joint venture for modernization of an existing bucket wheel exfcavator in operation.
机译:根据采矿设备的现代化计划,Severoceske确实从Prodeco和ThyssenKrupp Fordertechnik成立的合资企业中订购了一台吊具和两台斗轮挖掘机。该吊具于2000年投入运行(图4)。第一台斗轮挖掘机于2002年5月投入运行(图5和6)。第二台斗轮挖掘机的设计于2002年10月开始。 Severoceske doly已与合资企业签订了另一份订单,以对正在运行的现有斗轮挖掘机进行现代化改造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号