首页> 外文会议>International Conference on Environmental Remediation and Radioactive Waste Management >CONTAMINATED LAND AND GROUNDWATER MANAGEMENT AT SELLAFIELD, A LARGE OPERATIONAL SITE WITH SIGNIFICANT LEGACY AND CONTAMINATED LAND CHALLENGES
【24h】

CONTAMINATED LAND AND GROUNDWATER MANAGEMENT AT SELLAFIELD, A LARGE OPERATIONAL SITE WITH SIGNIFICANT LEGACY AND CONTAMINATED LAND CHALLENGES

机译:Sellafield的受污染的土地和地下水管理,这是一个具有重要遗产和污染土地挑战的大型运营网站

获取原文

摘要

Sellafield is a former Royal Ordnance Factory used since the 1940's for the production and reprocessing of fissile materials. Leaks and spills from these plants and their associated waste facilities has led to radioactive contaminated ground legacy of up to 20 million m3. Consideration of land contamination at Sellafield began in 1976, following discovery of a major leak from a waste storage silo. Over the past three decades there has been a programme of environmental monitoring and several phases of characterization. The latest phase of characterization is a {EUR}10million contract to develop second generation conceptual and numeric models. The Site Licence Company that operates the site has been subject to structural changes due to reorganizations within the British nuclear industry. There has also been a change in emphasis to place an increased importance on accelerated decommissioning. To address these challenges a new contaminated land team and contaminated land and groundwater management plan have been established. Setting and measuring performance against challenging objectives is important. The management plan has to be cognizant of the long timescales (ca. 80 years) for final remediation. Data review, collation, acquisition, analysis, and storage is critical for success. It is equally important to seize opportunities for early environmental gains. It is possible to accelerate the development and delivery of a contaminated land and groundwater management plan by using international experts.
机译:Sellafield是一家前皇家军械工厂,自1940年以来为生产和再加工裂变材料。这些植物的泄漏和泄漏和其相关的废物设施导致放射性污染的地面遗产高达2000万M3。在SellAfield的土地污染的考虑开始于1976年,在发现废物储存筒仓的主要泄漏之后。在过去的三十年里,已经有一个环境监测计划和几个阶段的表征。最新的表征阶段是开发第二代概念和数字模型的{EUR} 10million合同。由于英国核工业内部的重组,运营该网站的现场许可证公司一直受到结构性变化的影响。强调对加速退役的重要性也有所改变。为了解决这些挑战,已建立新的受污染的土地团队和污染的土地和地下水管理计划。针对具有挑战性目标的设置和衡量性能很重要。管理计划必须认识到最终修复的长时间时间(约80年)。数据审查,排序,收购,分析和存储对成功至关重要。抓住早期环境收益的机会同样重要。通过使用国际专家,可以加快开发和交付污染的土地和地下水管理计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号