首页> 外文会议>National light rail transit conference >Blurring the Light Rail Transit-Bus Rapid Transit Boundaries Rapid Light Transit
【24h】

Blurring the Light Rail Transit-Bus Rapid Transit Boundaries Rapid Light Transit

机译:模糊轻轨运输总线快速过境边界快速轻型运输

获取原文

摘要

During the last 30 years, light rail transit (LRT) has overtaken heavy-rail rapid transit as the high-capacity, high-performance transit mode most often chosen for new urban transit corridors in the United States. Now one may find that bus rapid transit (BRT), typically with lower cost than light rail but similar capabilities, may overtake LRT as the mode of choice for corridors in which capital-intensive transit is justified. What is involved in deciding upon a best course of action? Are these "either-or" technologies, or simply different expressions of the same concept? The author argues in favor of the latter, and suggests a new term encompassing common forms of both modes, rapid light transit (RLT), LRT and BRT in terms of the functions to be served, the forms fulfilling those functions, similarities between BRT and LRT regarding those forms, and issues of cost, funding, and implementation are explored. It is noted that the BRT form of RLT is almost always the lower-cost alternative; a metropolitan area will be able to deploy a network of high-performance transit more extensively and quickly as BRT rather than as LRT. Also noted are reasons why LRT may be chosen despite its higher cost, but the potential for using BRT as a first step, with later conversion to LRT, is also discussed. An RLT facility might also share BRT and LRT vehicles, or even be converted from LRT to BRT―a simple transition if light rail has been built with tracks embedded in pavement suitable for BRT vehicles.
机译:在过去的30年中,轻轨运输(LRT)已经超越了重型铁路的快速过境作为大容量,高性能的过境模式,最经常为美国新的城市过境走廊选择。现在有人可能会发现总线快速传输(BRT),通常具有比轻轨的成本更低,但相似的能力可能超过LRT作为资本密集型运输有合理的走廊的选择模式。决定最好的行动方案有什么关系?这些“无论是”技术,或者是同一概念的简单表达式?提交人支持后者,并提出了一种新的术语,包括符合函数的功能,快速光传输(RLT),LRT和BRT的新术语,表单符合这些功能,BRT之间的相似性探讨了这些形式的LRT,以及成本,资金和实施问题。值得注意的是,RLT的BRT形式几乎总是替代的替代品;大都市区将能够更广泛,快速地部署高性能过境网络而不是LRT。还注意到LRT可能选择的原因是尽管其成本更高,但也讨论了使用BRT作为第一步的可能性,随后转换为LRT。 RLT设施也可能共享BRT和LRT车辆,甚至可以从LRT转换为BRT-BRT-A简单的过渡,如果嵌入式嵌入式用于BRT车辆的路面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号