Case Study of Non-Mining Prediction and Control of Acid Rock Drainage -- The Vancouver Island Highway Project

机译:酸岩排水非采矿预测和控制案例研究 - 温哥华岛公路项目

获取原文

摘要

The Vancouver Island Highway Project (VIHP) was a 1.2 billion Canada dollars expenditure by the Province of British Columbia to improve travel safety and relieve traffic congestion between Victoria and Campbell River on Vancouver Island. In the section of highway between the Tsolum River and Oyster River, on the Inland Island Highway portion of the VIHP, over half of the rock to be cut and filled was found to be net acid generating. The Tsolum River has been impacted by metal leaching and acid rock drainage (ML/ARD) for decades from an upstream closed minesite. Geochemical testwork indicated: 1. over half of the rock along this section of highway was potentially net acid generating based on a site-specific SNPR (=NP/SAP) criterion of 1.5; 2. some core samples were already acidic; 3. pyrite occurred in disseminated framboidal and gel forms; 4. the rate of acid generation was not high; 5. measured neutralisation potential (NP) provided some lag time for the onset of net acidity; and 6. non-carbonate neutralising minerals prevented low pH (<4.0) from appearing in the humidity cells. These predictions led to ML/ARD controls involving: 1. realignment of the highway; 2. elevation control to minimise the volume of disturbed rock; 3. encapsulation of blasted-rock fills within the highway, surrounded by low-permeability till and covered with aspha and 4. diversion of water away from cut faces. Internal pipes drained any water reaching the fills into external ditches and ponds, where the water could be monitored and, if necessary, treated. Water from the cuts was also captured in ditches and carried to monitored ponds. Elevated aqueous sulfate concentrations in several ponds confirmed that sulfide minerals were oxidising, but the lack of both acidic pH and increasing trends in concentrations demonstrated that ML/ARD was controlled. Contingency plans for any pond that may become acidic include water treatment, which predictive testwork has shown would not require substantial amounts of limestone or lime.
机译:温哥华岛公路项目(VIHP)是英国哥伦比亚省的12亿加拿大美元支出,以改善维多利亚岛和坎贝尔河之间的旅行安全和缓解交通拥堵。在Tsolum河和牡蛎河之间的公路部分,在VIHP的内陆岛公路部分上,发现超过一半的岩石被发现并填充是净酸产生的。 TSOLUM河已受到金属浸出和酸岩排水(ML / ARD)的影响,几十年从上游闭合的大型矿石。地球化学验证指出:1。沿着这段高速公路的岩石的超过一半是基于1.5的特定点特异性SNPR(= NP / SAP)的净酸产生。一些核心样本已经是酸性的; 3.黄铁矿发生在传播的Framboidal和凝胶形式中; 4.酸产生的速度不高; 5.测量的中和电位(NP)提供了净酸度发作的一些滞后时间; 6.非碳酸盐中和矿物质可防止低pH(<4.0)出现在湿度细胞中。这些预测导致ML / ARD控制涉及:1。高速公路重新调整; 2.高程控制,以最大限度地减少受扰动的岩石的体积; 3.封装爆破的岩石填充在高速公路内,被低渗透率包围,直至沥青覆盖; 4.将水转移离剪纸。内部管道排出任何水到达填充物到外部沟渠和池塘,可以监测水,并在必要时进行治疗。来自削减的水也被捕获在沟渠中并带到监控的池塘。几个池塘的硫酸盐水溶液浓度证实,硫化物矿物质氧化,但缺乏酸性pH和浓度的增加趋势,表明控制ML / ARD。任何可能成为酸性的池塘的应急计划包括水处理,预测验证已经显示出不需要大量的石灰石或石灰。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号