首页> 外文会议>International mining geology conference >Staff Development and Training at Geita Gold Mine, Tanzania
【24h】

Staff Development and Training at Geita Gold Mine, Tanzania

机译:坦桑尼亚吉塔金矿的员工开发与培训

获取原文

摘要

Geita Gold Mining Limited (GGML) is owned and jointly managed by Ashanti Goldfields Company (Ghana) and Anglogold (South Africa). The mine is currently one of the largest gold producing open pit operations in Africa producing 620 000 ounces of gold and mining in excess of 70 000 000 tonnes of material per annum. The mine currently has 2000 full time employee's and a mine life in excess of 12 years. Geita Gold Mine is comprised of 11 different gold deposits situated in the Lake Victoria Goldfields of North Western Tanzania (Figure 1). The gold deposits are primarily associated with banded ironstone formations within an Archaean greenstone belt. Current global resources, including Inferred, stand at 129.5 million tonnes grading 3.91g/t (16.2Moz). Open pit reserves total 70.4 million tonnes grading 4.16 g/t (9.4 M oz). The majority of the gold resource is hosted by the three deposits (Nyankanga, Lone Cone and Geita Hill) within the 'Geita Trend' a large and continuous (>4 km long) mineralised zone (Adofo, 2002). Geita Gold Mine commenced operations in June 2000, as the second large-scale open pit gold mine in Tanzania. The new workforce of 800 people had no previous experience in open pit gold mining. Since the start of the operation, Geita Gold Mine's management ambition was to become a world leader in the application of best practice in all technical disciplines and in operational success. Staff development and training was identified as one of the major components in the company achieving its aim. Geita Gold Mine's management has committed the necessary training staff, resources and the commitment of over $US 1 M a year to staff training and development programs for 2003 and 2004. The process and management of Geita Gold Mine's mining geology staff training and development program is presented in this paper.
机译:Geita Gold Mining Limited(GGML)由Ashanti Goldfields公司(加纳)和盎格鲁德(南非)拥有和联合管理。该矿山目前是非洲最大的黄金生产露天业务之一,生产620 000盎司的金,每年超过70 000 000吨的材料。该矿目前拥有2000年全职员工,矿山生活超过12年。 Geita金矿由11家不同的金矿床组成,位于坦桑尼亚北部维多利亚金德(Victoria Goldfields)(图1)。金沉积物主要与拱形绿石带内的带状铁结构形成相关。目前的全球资源包括推断,达到129.5百万吨分级3.91g / t(16.2moz)。露天坑储量总计7040万吨分级4.16克/吨(9.4米盎司)。大多数黄金资源由三个存款(Nyankanga,Lone Cone和Geita Hill)托管在'Geita Trend'是一个大而连续的(> 4公里长)矿化区(Adofo,2002)。 Geita金矿于2000年6月开始运营,是坦桑尼亚的第二大型露天金矿。 800人的新劳动力在露天金矿中没有经验。自业务开始以来,葛田金矿的管理野心是在适用所有技术学科和运作成功中应用最佳实践的世界领导者。员工的开发和培训被确定为公司达到目标的主要组成部分之一。 Geita Gold Mine的管理层致力于为2003年和2004年的员工培训和发展方案致力于每年培训人员,资源和超过1米以上的承诺.Geita金矿的矿业地质职业培训和发展计划的进程和管理是本文提出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号