首页> 外文会议>International Symposium on Hydrometallurgy >CAPACITY ENHANCEMENT AT NEWMONT MINING CORPORATION'S TWIN CREEKS WHOLE ORE PRESSURE OXIDATION FACILITY
【24h】

CAPACITY ENHANCEMENT AT NEWMONT MINING CORPORATION'S TWIN CREEKS WHOLE ORE PRESSURE OXIDATION FACILITY

机译:NewMont Mining Corporation的Twin Creeks全矿压氧化设施的能力增强

获取原文

摘要

Hatch Ltd. has recently completed a project to increase refractory gold ore processing capacity at Newmont Mining Corporation's Twin Creeks facility. The objective of the project was to increase throughput by approximately 10% by adding a third autoclave feed pump to each of the two autoclave circuits. To minimize project capital cost, autoclave feed pumps from Newmont's decommissioned Lone Tree facility were evaluated and found to be suitable for this new service. The existing pressure oxidation circuit was reviewed in a debottlenecking study to determine other upgrades required to facilitate the increased throughput. Interruption to operations was minimized with a detailed construction plan, supplemented with detailed 3D layout model sequencing studies. The focus of this paper is project development, multi-discipline design considerations, and implementation results.
机译:Hatch Ltd.最近完成了一个项目,以提高NewMont Mining Corporation的Twin Creeks设施的耐火金金矿加工能力。该项目的目的是通过向两个高压釜电路中添加第三高压灭菌器泵来提高吞吐量约10%。为了最大限度地减少项目资本成本,评估来自NewMont退役孤树设施的高压灭菌泵,并发现适合这项新服务。在脱肉型研究中审查了现有的压力氧化电路,以确定促进吞吐量增加所需的其他升级。通过详细的施工计划将对操作的中断最小化,补充有详细的3D布局模型测序研究。本文的重点是项目开发,多学科设计考虑和实施结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号