首页> 外文会议>Copper-Cobre international conferences >The FENIX hydromet iron control system for purification of copper electrowinning solutions
【24h】

The FENIX hydromet iron control system for purification of copper electrowinning solutions

机译:Fenix Hydomet Iron Control系统,用于纯化铜电绕组溶液

获取原文

摘要

The FENIX hydromet iron control system has been installed at Western Metals Copper Limited's Mount Gordon Operations in Queensland, Australia. The Mt. Gordon Copper Process uses an autoclave leach and solvent extraction process to recover copper from sulfide ores. Iron is transferred with copper through solvent extraction. This iron accumulates in the electrowinning circulation and must be controlled. Prior to September 2002, the mode of iron control was to bleed a volume of electrolyte to the leach circulation. The FENIX system substantially replaces the bleed system of iron control at Mt. Gordon. The FENIX unit loads iron from the electrowinning solution on a sulfonated monophosphonic acid resin followed by stripping using a novel cuprous sulfate elution solution. The FENIX system installed at Mt. Gordon has delivered significant savings in reagent consumption and has the potential to deliver higher current efficiencies in copper electrowinning, leading to increased copper production. The FENIX system was commissioned in September 2002, with a design removal rate of 220 kg of iron per day. The unit has achieved iron removal rates of over 300 kg per day. This paper provides a description of the principles of iron control using the FENIX system. The engineering, installation and operational data of the Mt. Gordon unit are discussed. Finally, the operating performance and benefits of the FENIX system at the Mt. Gordon site are presented.
机译:Fenix Hydomet Iron Control系统已安装在澳大利亚昆士兰州昆士兰州的西部金属铜有限公司的戈登业务。 Mt.Gordon铜工艺使用高压釜浸出和溶剂萃取工艺来回收硫化物矿石的铜。铁通过溶剂萃取用铜传递。该铁积聚在电循环中,必须控制。在2002年9月之前,铁控制模式是将一体积电解质渗出到浸出循环。 Fenix系统基本上取代了Mt.Gordon在Mt.的铁控制漏系统。 Fenix单元从磺化的单膦酸树脂上的电绕组溶液负载铁,然后使用新型硫酸亚铜洗脱溶液汽提。安装在Mt.Gordon的Fenix系统在试剂消耗中提供了大量节省,并有可能在铜电压中提供更高的电流效率,从而提高铜生产。 Fenix系统于2002年9月委托,每天设计去除率为220公斤。该单位已达到每天超过300公斤的铁去除率。本文提供了使用Fenix系统的铁控制原理的描述。讨论了Mt.Gordon单元的工程,安装和运营数据。最后,展示了Mt.戈登网站上的Fenix系统的经营性能和优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号