POST-EARTHQUAKE ACTIONS FOR RESTORATION OF PORT STRUCTURES

机译:恢复港口结构的地震行动

获取原文

摘要

Immediately after a devastating earthquake, many engineers face an engineering challenge. They have to act swiftly to make a series of important engineering decisions in order to obtain the best solution for restoring the damaged port structures. The restoration should be made in a limited time span using the available resources and should cause minimum disturbance to the remaining operational functions of a port. The objective of this paper is to give an overview on a recommended procedure based on the experiences gained from the recent earthquakes, notably the 1995 Great Hanshin (Kobe) earthquake, Japan. The recommended procedure consists of four phases: (1) The first phase is the preliminary investigation of damage, and should be performed within 24 hours after the earthquake. This is to capture an overview of damage to port facilities and mainly conducted by eye and engineering judgement. (2) The second is the emergency action phase, and performed within 48 hours after the earthquake. This phase is to decide whether or not emergency measures should be implemented to avoid secondary disaster. If the secondary disaster is deemed possible, then emergency actions should be implemented. This phase also includes the decisions on whether or not partially damaged facilities should be utilized for emergency use. (3) The third phase is the emergency restoration phase, and performed within 7 days after the earthquake. This phase is to perform supplementary investigation of damage necessary for implementing emergency restoration measures for partially damaged facilities. Once the emergency restoration measures have been completed, then the partially restored facilities will be used to meet the emergency objectives, including handling emergency cargos for earthquake affected areas. (4) The fourth phase is the tentative restoration phase, and performed within 30 days after the earthquake. This phase is to implement tentative restoration measures for damaged port structures deemed feasible in the third phase. Permanent restoration for the rest of the facilities will be performed after the fourth phase, 30 days after the earthquake. The paper addresses the appropriate engineering criteria for decision making in each phase of restoration. Case histories will also be given in the paper.
机译:在发生毁灭性的地震之后,许多工程师立即面临工程挑战。他们必须迅速采取行动,以制定一系列重要的工程决策,以便获得恢复损坏的端口结构的最佳解决方案。应使用可用资源在有限的时间范围内进行恢复,并应对端口的剩余操作功能导致最小干扰。本文的目的是概述基于从最近的地震中获得的经验的推荐程序概述,特别是1995年伟大的汉斯(神户)地震,日本。建议的程序由四个阶段组成:(1)第一阶段是初步调查损害,应在地震后24小时内进行。这是为了捕获港口设施损坏的概述,主要由眼睛和工程判断进行。 (2)第二是紧急情况阶段,并在地震后48小时内进行。该阶段是决定是否应实施紧急措施以避免二次灾害。如果可能被视为可能,则应实施紧急行动。该阶段还包括关于是否应用于应急使用的部分受损设施的决定。 (3)第三阶段是应急恢复阶段,并在地震后7天内进行。该阶段是对实施部分受损设施的应急恢复措施所需的损害进行补充调查。一旦紧急恢复措施完成,将使用部分恢复的设施来满足紧急目标,包括处理地震影响地区的紧急卡根。 (4)第四阶段是暂定恢复阶段,并在地震后30天内进行。该阶段是为第三阶段认为可行的损坏端口结构的暂时恢复措施实施。其余设施的永久修复将在地震后30天后进行第四阶段。本文解决了在每个阶段的决策中的适当工程标准。案例历史也将在论文中给出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号