LOCAL SCOUR AND PROTECTION OF F3 OFFSHORE GBS PLATFORM

机译:F3离岸GBS平台的本地冲刷和保护

获取原文

摘要

In 1992 a GBS (Gravity Based Structure) was placed in the F3 block in the Dutch sector of the North Sea. Gabion mattresses around the GBS were applied to prevent scour. The potential scour and the required dimensions of the gabion mattresses were determined before the installation in small-scale physical model tests. After the installation of the GBS, annual surveys have been carried out to provide information about the scour development around the GBS and the status of the protection system. This paper presents field observations of local scour development around the F3 GBS platform and an evaluation of the performance of the scour protection system. The objectives were to assess the maximum scour around the GBS and to determine a cost-effective survey strategy. To assess the maximum scour around the GBS, metocean conditions for the F3 GBS location were hindcasted for the period between the platform installation and the latest survey. The observed scour depths were analysed and compared with predictions both from the model tests and from existing empirical formulas. The results showed that the predicted scour depths based on the model tests agree reasonably well with the field observations. The empirical formulas give larger scour depths than the surveys. Based on the field observations in combination with predictions of the models, the maximum scour depths under the design extreme environmental conditions have been determined. To determine a cost effective survey strategy, the behaviour and performance of the gabion mattresses were evaluated based on the annual surveys and video inspections. It was concluded that the protection system has functioned well and no damage was observed. On the basis of the maximum expected scour and the performance of the gabion mattresses, it was considered that the survey frequency may be reduced. Surveys and inspections may be carried out every three years instead of every year, and after a severe storm.
机译:1992年,GBS(基于重力的结构)被置于北海的荷兰行业的F3块中。 GB周围的Gabion床垫被应用于防止冲刷。在安装小规模物理模型试验之前确定了船舶床垫的潜在冲刷和所需尺寸。在安装GBS之后,已经开展了年度调查,以提供有关GB周围的冲刷发展的信息和保护系统的状态。本文介绍了F3 GBS平台周围局部冲刷发展的现场观察,并评估了防水系统的性能。目标是评估GBS周围的最大冲刷,并确定具有成本效益的调查策略。为了评估GBS周围的最大冲刷,在平台安装和最新调查之间的时间段内,F3 GBS位置的元条件是Hindcasted。分析了观察到的冲刷深度,并与模型测试和现有的经验公式的预测进行了比较。结果表明,基于模型测试的预测的冲刷深度与现场观察相当良好。经验公式比调查提供更大的冲刷深度。基于现场观测结合模型的预测,确定了设计极端环境条件下的最大冲刷深度。为了确定成本效益的调查策略,基于年度调查和视频检查评估了Gabion床垫的行为和性能。得出结论,保护系统功能良好,没有损坏。在最大预期冲刷和船只床垫的性能的基础上,认为可以减少调查频率。调查和检查可能每三年而不是每年进行一次,并且在严重风暴之后进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号