首页> 外文会议>International Symposium on Automation and Robotics in Construction >Workflow Re-engineering for Implementing a 4D Construction Management Tool in a Design-Build Project
【24h】

Workflow Re-engineering for Implementing a 4D Construction Management Tool in a Design-Build Project

机译:工作流程重新设计,用于在设计 - 构建项目中实现4D施工管理工具

获取原文

摘要

The use of 4D management tool in construction industry has been growing rapidly in recent years in response to soaring demands on efficient construction management. Successful implementation of this tool in an engineering firm for use in real projects is still challenging. This paper shares the experience on implementing an in-house 4D management tool in a large EPC (Engineering, Procurement and Construction) firm that has extended reputation on design-build projects. A new workflow was proposed that takes full advantage of the 4D tool to enhance construction management performance and minimizes impacts on the firm's existing workflow. The workflow development for the firm to implement 4D management tool in real project was done by interviewing key personnel in multiple departments of the firm and by carefully examining probable impacts of the 4D tool's introduction into the firm's business processes.
机译:近年来,在建筑业的4D管理工具在近年来,在高效施工管理的需求飙升时,近年来一直在迅速增长。在工程公司中成功实施此工具以用于实际项目仍然具有挑战性。本文分享了在大型EPC(工程,采购和建设)公司中实施内部4D管理工具的经验,这些工具在设计 - 建立项目上延长了声誉。提出了一种新的工作流程,充分利用4D工具,以提高施工管理性能,并最大限度地减少对公司现有工作流程的影响。通过在公司多个部门的关键人员以及仔细检查4D工具介绍进入公司业务流程的介绍可能的影响,通过面试重点人员来实现实际项目中实施4D管理工具的工作流程开发。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号