A MODEL FOR AUTOMATED GENERATION OF RESOURCE-DRIVEN CONSTRUCTION SCHEDULE FOR HOUSING INDUSTRY

机译:住房行业资源驱动施工时间表的自动生成模型

获取原文

摘要

The efficacy of managing a construction project mainly depends on proper planning and scheduling. Mass housing projects are highly repetitive in nature, as the methods used for construction are often repetitive or cyclic. Resources are therefore being deployed repeatedly for the similar or identical tasks in these projects. In order to eradicate delays in mobilizing resources, an efficient resource schedule is required. Traditional scheduling tools like Critical Path Method (CPM), Programme Evaluation and Review Technique (PERT) are less effective in scheduling repetitive construction projects, as they consider availability of resources are unlimited. The main challenge in preparing construction schedule for repetitive projects is synchronizing the precedence logic and the allocation of resources as per requirements for all the activities. Consequently, activity scheduling and resource planning are prepared in parallel and this will facilitate in eliminating delays and idle resources across the projects thereby, controls the chain-reaction management (ripple effects). Nevertheless, almost all the repetitive scheduling methods developed so far have been giving focus on continuous repetitive projects, whereas in the present study, the emphasis is on discrete (non-linear) repetitive projects. This paper presents a model that uses genetic algorithms to optimally assign resources to repetitive activities, which aimed to minimize the total project cost & duration, idle cost & time and to maximize resource utilization. In the present study, an attempt is made to generate a resource-driven construction schedule automatically, with which resources can optimally be allocated to the activities. This schedule can be very useful in improving productivity and saving construction time and cost and also in decision-making. In addition, a case study is delineated to check the efficiency and effectiveness of the resource-driven construction schedule which is automated.
机译:管理建筑项目的功效主要取决于适当的规划和调度。大众房屋项目本质上是高度重复的,因为用于施工的方法通常是重复的或循环。因此,资源正在重复部署这些项目中的类似或相同的任务。为了消除动员资源的延迟,需要有效的资源计划。传统的调度工具,如关键路径方法(CPM),程序评估和审查技术(PERT)在调度重复建设项目方面不太有效,因为它们考虑资源的可用性是无限的。准备重复项目施工时间表的主要挑战是根据所有活动的要求同步优先逻辑和资源分配。因此,并行准备活动调度和资源规划,这将有助于消除延迟和跨越项目的空闲资源,从而控制链反应管理(纹波效果)。尽管如此,到目前为止,几乎所有重复的调度方法都一直在重视连续重复项目,而在本研究中,重点是在离散(非线性)重复项目上。本文介绍了一种模型,它使用遗传算法最佳地将资源分配给重复活动,这旨在最大限度地减少总项目成本和持续时间,空闲成本和时间并最大限度地提高资源利用率。在本研究中,尝试自动地生成资源驱动的施工计划,其中可以最佳地将资源用于活动。该计划对于提高生产力和节省施工时间和成本以及决策方面也非常有用。此外,案例研究被描绘以检查资源驱动的施工时间表的效率和有效性,该施工时间表是自动化的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号