首页> 外文会议>International Conference on Soil Mechanics and Geotechnical Engineering >Design and construction of large caverns for underground mine facilities in the Andes of Central Chile
【24h】

Design and construction of large caverns for underground mine facilities in the Andes of Central Chile

机译:智利中部地下矿井设施大型洞穴的设计与施工

获取原文

摘要

The Division Andina of Codelco Chile owns the Rio Blanco and Sur-Sur mines, two porphyry cooper-molybdenum deposits located in the Rio Blanco Valley, at elevations between 3150 and 4200 m a.s.l. in the Andes of Central Chile. This valley is deep andnarrow with steep glaciated hillsides. Winter conditions are severe, and snow accumulation may be more than 10 m thick, with frequent snow avalanches affecting surface mine facilities and access roads. The Don Luis Primary Crusher and the SAG Mill caverns, some of the largest underground mine openings in South America, are part of the Expansion Project recently undertaken by Division Andina to increase production and to allow continuous operation during winter. This paper describes the geologic-geotechnical context, the structural/stability analysis, the corresponding geometric design and rock support, and construction methodology for these caverns.
机译:Codelco Chile的司司长拥有里约热内卢和血管矿山,位于里约热内卢山谷的两个斑岩Cooper-Molybdenum矿床,在3150和4200米A.L.1之间。在智利中部的andes。这场山谷是深陷的冰川山坡。冬季条件严重,积雪可能超过10米厚,频繁的雪崩影响表面矿山设施和通道道路。 Don Luis Primary Crusher和Sag磨坊洞穴,南美洲的一些最大的地下矿井开口,是最近由司司长队进行的扩建项目增加产量,并在冬季持续运行。本文介绍了地质岩土学背景,结构/稳定性分析,相应的几何设计和岩石支撑,以及这些洞穴的施工方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号