首页> 外文会议>IFAC World Congress >Performance Limitations arising in the Control of Power Plants
【24h】

Performance Limitations arising in the Control of Power Plants

机译:电厂控制中产生的性能限制

获取原文

摘要

This paper presents results on performance limitations for direct fired coal power plants. A specific feature of this system is the existence of a very large input delay between one of the inputs, namely coal flow, and the two outputs, load and vapour pressure. This problem motivates the main theoretical question addressed in this paper: To examine tracking performance limitations in one process variable when another process variable is constrained. Our main result makes explicit the performance trade-off between the two conflicting objectives, and also links the achievable performance to the delay structure of the plant. These results give insights into the benefits of MIMO control for power plants and into the necessary trade-off between fast tracking of load step changes and the need for minimizing the variations of the vapour pressure around its nominal value. The results provide a benchmark against which practical controller designs for power plants can be assessed.
机译:本文提出了直接燃煤电厂的性能限制。该系统的特定特征是存在一个输入,即煤流和两个输出,负载和蒸汽压力之间的非常大的输入延迟。此问题激励了本文解决的主要理论问题:当另一个进程变量受约束时,检查一个过程变量中的跟踪性能限制。我们的主要结果使两个相互矛盾的目标之间的性能折衷,并将可实现的性能与工厂的延迟结构联系起来。这些结果对发电厂MIMO控制的益处以及进入载荷步骤的快速跟踪之间的必要权衡的洞察力,需要最小化其标称值周围的蒸气压的变化。结果提供了一种基准,可以评估发电厂的实用控制器设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号