REPOWERING THE MARGHERA LEVANTE POWER PLANT

机译:重新推动Marghera Levante Power Plation

获取原文

摘要

Following the governmental decision to repower and to reclaim the Edison Termoelettrica petrochemical plant of Marghera Levante, near Venice, in order to increase the efficiency and to reduce emissions, Ansaldo Energia and Siemens KWU, joined in a Temporary Business Agreement with Ansaldo Energia as leader of the TBA, won the international bid announced by Edison Termoelettrica, to design, supply and install the power island, all the rotating machines and related mechanical and I&C equipment, to be joined to the remaining part (HRSG and refurbished steam turbine) of an overall combined cycle of 380 MW. The installed gas turbine is a V94.3A(2) supplied by Siemens KWU/Ansaldo Energia, with annular chamber technology, equipped with dry low NO{sub}x hybrid burners, fuelled with natural gas, thus achieving very low emission figures. The gas turbine is coupled to a Top Air generator of 300 MVA supplied by Ansaldo Energia, air cooled. Ansaldo Energia has been responsible also for design, supply, installation and commissioning of the complete power island. The design of the plant has been very much focused on obtaining very easy operation and maintenance.
机译:在政府决定重新夺回并回收威尼斯附近的Marghera Levante的Edison Termoelettrica石油化学植物,以提高效率和减少排放,Ansaldo Energia和Siemens Kwu,与Ansaldo Energia担任领导者TBA荣获由Edison Termoelettrica宣布的国际竞标,设计,供应和安装电力岛,所有旋转机器和相关机械和I&C设备,加入整体的剩余部分(HRSG和翻新汽轮机)合并循环380兆瓦。安装的燃气轮机是由西门子KWU / Ansalde Energia提供的V94.3a(2),带有环形室技术,配备有干燥的低No {u} X混合燃烧器,以天然气燃料,从而实现了极低的排放数据。燃气轮机连接到由Ansaldo Energia提供的300 MVA的顶部空气发生器,空气冷却。 ANSALDO Energia也负责完整的电力岛的设计,供应,安装和调试。该工厂的设计非常重点是获得非常简单的操作和维护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号