首页> 外文期刊>VGB PowerTech >Rheinhafen Steam Power Plant Unit 4 - Successful Repowering from a Hard Coal Unit into a Combined-cycle Power Plant -
【24h】

Rheinhafen Steam Power Plant Unit 4 - Successful Repowering from a Hard Coal Unit into a Combined-cycle Power Plant -

机译:莱茵哈芬蒸汽发电厂4号机组-从硬煤机组成功改造为联合循环发电厂-

获取原文
获取原文并翻译 | 示例
       

摘要

Long-term supply agreements signed in 1993 committed the EnBW Kraftwerke AG, a 100 % subsidiary of EnBW AG, Karlsruhe, to providing top performance. To be able to meet this obligation, the company decided in 1995 to upgrade Unit 4 of the Rheinhafen Steam Power Plant (Rheinhafen-Dampfkraftwerk - RDK), from a hard coal unit into a modern, peak load, combined-cycle power plant and to increase the unit output from 100 to approximately 360 MW. At that time Unit 4 had been out of operation. From November 1998 until October 2000 the GT26 AB gas turbine upgrade was successfully implemented. Today, after more than 2000 operating hours of peak shaving service, the GT26 gas turbine can be considered a success in the repowering application at RDK.
机译:1993年签署的长期供应协议使EnBW Kraftwerke AG(卡尔斯鲁厄EnBW AG的100%子公司)承诺提供最佳性能。为了履行此义务,公司于1995年决定将莱茵哈芬蒸汽发电厂(Rheinhafen-Dampfkraftwerk-RDK)的4号机组升级,从硬煤机组升级为现代化的高峰负荷联合循环发电厂,将机组输出功率从100 MW增加到大约360 MW。当时第4单元已经停运。从1998年11月到2000年10月,成功实施了GT26 AB燃气轮机升级。如今,经过超过2000个工作小时的调峰服务之后,GT26燃气轮机在RDK的重新供电应用中被认为是成功的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号