High-Grade Uranium Mining at McArthur River, Saskatchewan, Canada

机译:高档铀矿业在Mcarthur河,萨斯喀彻温省,加拿大

获取原文

摘要

Cameco Corporation operates the high-grade 140 tpd fly-in/fly-out underground McArthur River Uranium Mine in Northern Saskatchewan in a joint venture with Cogema Resources Inc. Reserve grade is in excess of 20 per cent U_3O_8 with current mining grade averaging 16 per cent U_3O_8. Due to the high radiation potential of the ore, the non-entry mining method of raiseboring was chosen to minimise worker radiation exposure potential. The raisebore and extraction horizons are located in waste rock with the orebody located between horizons. Ore produced by raiseboring is delivered by LHD to an underground SAG mill and is then hydraulically hoisted to surface receiving facilities after underground thickening to 50 per cent solids by weight. Concrete backfilling is utilised. The orebodies at McArthur River are adjacent to water bearing sandstone. Ground freezing is therefore employed to isolate the ore from this water bearing ground. Calcium chloride brine at -35 deg C is circulated through a series of cased boreholes to establish freeze walls up to 25 metres in thickness. At 18 000 000 lb of low cost U_3O_8 production per annum, McArthur River ranks as the worlds' largest uranium mine. Over 50 per cent of the workforce resides in this sparsely populated area of Canada with approximately 40 per cent being of aboriginal ancestry. Site operations must cater for winter temperatures as low as -50 deg C.
机译:Cameco Corporation在北萨斯喀彻温省的高档140 TPD Fly-In / Fly-Out地下Mcarthur河铀矿,在Cogema Resources Inc.的合资企业中,储备级别超过20%的U _3O_8,具有当前采矿等级的平均级别16十分U_3O_8。由于矿石的高辐射电位,选择了饲料中的非进入采矿方法,以最大限度地减少工人辐射曝光电位。提取纤维和提取地域位于废岩中,矿体位于地平线之间。由饲料制备的矿石通过LHD输送到地下凹槽磨机,然后在地下增厚后液压升温到表面接收设施,重量为50%。使用混凝土回填。 Mcarthur River的矿石与含水砂岩相邻。因此,采用地面冷冻将矿石与该矿石的地面隔离。氯化钙盐水在-35℃下循环通过一系列套孔,以建立厚度高达25米的冻结壁。每年18 000磅低成本U_3O_8生产,McArthur河作为世界上最大的铀矿等级。超过50%的劳动力居住在加拿大的稀疏人口,约有40%的土着血统。现场运营必须迎合冬季温度低至-50℃。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号