Planning Graph-based Heuristics for Cost-sensitive Temporal Planning

机译:规划基于图形的成本敏感时间计划的启发式方法

获取原文

摘要

Real world planners need to be sensitive to the quality of the plans they generate. Unlike classical planning where quality is often synonymous with plans having least number of actions, in temporal planning plan quality is multidimensional. It involves both temporal aspects of the plan (such as makespan, slack, tardiness) and execution cost aspects (such as cumulative action cost, resource consumption). Until now, most domain-independent temporal planners have concentrated solely on the former, ignoring the latter. In this paper, we consider the problem of developing heuristics that are sensitive to both makespan and cost, and develop a planning graph-based approach for this purpose. Our approach involves augmenting a (temporal) planning graph data structure with a mechanism to track the execution cost of the goals and subgoals. Since the cost of achieving a goal is dependent on the amount of available time, we need to track the cost of a literal as a function of time. We present a methodology for efficiently tracking the cost functions, and discuss how they can be used as the basis for deriving heuristics to support any objective function based on makespan and execution cost. We demonstrate the effectiveness of this general method for deriving cost- and makespan-sensitive heuristics in the context of Sapa a forward chaining planner for metric temporal domains that we have been developing. A version of Sapa using a subset of the techniques discussed in this paper was one of the best domain independent planners for domains with metric and temporal constraints in the third International Planning Competition, held at AIPS-02.
机译:现实世界规划者需要对他们产生的计划的质量敏感。与古典规划不同,质量往往与至少有至少行动的计划的同义,在时间计划计划质量中是多维的。它涉及计划的时间方面(例如Makespan,Slack,Tardiness)和执行成本方面(例如累积动作成本,资源消耗)。到目前为止,大多数域名独立的时间规划人员完全集中在前者上,无视后者。在本文中,我们考虑了开发对Mapspan和成本敏感的启发式的问题,并为此目的制定基于规划图的方法。我们的方法涉及使用机制增强(时间)规划图数据结构以跟踪目标和子站的执行成本。由于实现目标的成本取决于可用时间的数量,因此我们需要跟踪文字的成本作为时间的函数。我们提出了一种有效跟踪成本函数的方法,并讨论如何将它们作为推导出推导出来的基础,以基于Makespan和执行成本支持任何客观函数。我们展示了这种通用方法在SAPA的上下文中导出了成本和Makespans敏感的启发式的有效性,我们已经发展的公制时间域名。使用本文讨论的技术子集的SAPA版本是在AIPS-02举行的第三次国际规划竞赛中最佳域名独立规划师的最佳领域独立规划者之一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号