首页> 外文会议>National seismic conference >Cost Impact Study for a Typical Highway Bridge Using Different Return Period Seismic Design Maps
【24h】

Cost Impact Study for a Typical Highway Bridge Using Different Return Period Seismic Design Maps

机译:不同返回时期地震设计地图的典型公路桥梁成本影响研究

获取原文

摘要

This paper compares the costs of a typical three-span P/S I-girder bridge designed for seismic categories A, B, C, and D based on the current 1996 AASHTO Standard Specifications for Highway Bridges for a 500-year return period earthquake (i.e. 10% probability of exceedance in 50 years) as well as for different spectral response accelerations specified in the current USGS map (1997 NEHRP Provisions) for a 2500-year return period earthquake (i.e. 2% PE in 50 years) which is being considered for future AASHTO Seismic Design Guidelines for Highway Bridges. For both 500-year and 2500-year design earthquakes, the mitigation of potential ground spreading due to abutment slope instability associated with liquefaction potential of soil using stone columns and deep mixed (cement-soil mix) columns are included in the cost estimation. The foundation flexibility is also taken into account in the bridge analysis and design. The cost comparison of this study can provide a general guideline on the bridge preliminary cost estimation, which can be very helpful for the preparation of the budget for highway projects. It also provides the cost impact on the significance of designing a bridge in the New Madrid seismic zone from a 500-year return period design earthquake to a 2500-year design earthquake. It indicates that the cost impact of changing from 10% PE design earthquake map to 2% PE design earthquake map is not significant for bridges at locations being classified as the current seismic categories B and C, if some conservative design provisions in the current AASHTO seismic design specifications are not adopted. However the cost may increase 19%, if a bridge located in the current seismic category D is designed using 2% PE design earthquake map instead of 10% PE design earthquake map. It also indicates that the improvement of abutment slope stability may increase bridge cost significantly if 2% PE earthquake is used.
机译:本文比较了典型的三跨P / S i-girder桥的成本,专为地震类别A,B,C和D而设计,基于当前的1996年AASHTO标准规范,为500年回报期地震(即50年的10%的概率超过50年的概率,以及在当前的USGS地图(1997年NEHRP规定)中指定的不同光谱响应加速度,用于2500年的返回期地震(即50年的2%PE),该地震正在考虑用于未来AASHTO桥梁的地震设计指南。对于500年和2500年的设计地震,成本估算中包括与使用石柱和深层混合(水泥 - 土壤混合物)柱的抵抗坡不稳定性导致的潜在地面扩散的减缓。在桥梁分析和设计中也考虑了基础灵活性。本研究的成本比较可以提供关于桥梁初步成本估算的一般指导,这对编制公路项目预算非常有帮助。它还为从500年的返回时期设计地震到2500年的设计地震,为新的马德里地震区设计一座桥梁的重要性。它表明,从10%PE设计地震地图改变的成本影响到2%PE设计地震地图对于所分类为当前地震类别B和C的地区的桥梁,如果目前的AASHTO地震中的一些保守设计规定未采用设计规范。然而,如果位于当前地震类别D中的桥梁设计使用2%PE设计地震图而不是10%PE设计地震图设计,费用可能会增加19%。它还表明,如果使用2%PE地震,则邻接斜率稳定性的提高可能会增加桥接成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号