首页> 外文会议>U.S. rock mechanics symposium >Stability analysis of a tunnel supported by shotcrete-rockbolt system in hard bedrock
【24h】

Stability analysis of a tunnel supported by shotcrete-rockbolt system in hard bedrock

机译:Shorcete-Rockbolt System在硬基岩中支持的隧道稳定性分析

获取原文

摘要

In tunnel excavation methods that use rock as main support, shotcrete and rockbolt are installed to help the formation of ground arch region as a primary reinforcement. For the evaluation of tunnel stability in hardrock, the ground displacements, convergence and the internal forces of reinforcements have been measured on representative 6 sections of tunnel. Also, the numerical modeling is performed. Deficient investigation data and the heterogeneity of rock properties might cause impreciseness of numerical modeling output and measured data analysis. To avoid these problems, the analysis area and overburden loads were corrected to fit more safe criteria, and the properties of shotcrete-rock interface, that were estimated through experiments, were applied to the numerical analysis. The measured data and numerical output analysis showed that ground displacements after excavation reliably converged without introducing plastic zone and the internal forces of reinforcements are under failure limits.
机译:在隧道挖掘方法中,使用岩石作为主要支撑,安装射击块和摇滚栓,以帮助形成地面拱形区域作为主要加固。为了评估硬rock中的隧道稳定性,在隧道的代表性6段测量了地面位移,收敛和内部力量。此外,执行数值建模。缺陷的调查数据和岩石特性的异质性可能导致数值建模输出的不精确和测量数据分析。为避免这些问题,纠正分析区域和覆盖载荷,以适应更安全的标准,并通过实验估计的喷射岩界面的性质应用于数值分析。测量的数据和数值输出分析表明,在不引入塑料区的情况下,挖掘后的地面位移可靠地融合,并且增强材料的内部力量在失效限制下。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号