首页> 外文会议>U.S. rock mechanics symposium >Pilot-scale thermal tests of drip shield configuration for the Yucca Mountain project
【24h】

Pilot-scale thermal tests of drip shield configuration for the Yucca Mountain project

机译:丝兰山区项目的滴灌配置试验规模热试验

获取原文

摘要

The Yucca Mountain Site Characterization Project has completed two pilot-scale tests of the potential repository drip shield configuration over waste packages. One test included backfill over the drip shield and one did not. Both tests were constructed at 1/4 scale of the potential repository emplacement drift dimensions, and both employed heaters to control temperatures of the simulated drift wall and simulated waste package. Test results confirmed that the drip shield would function as intended by design. No appreciable water penetrated the drip shield structures; no condensation was detected under the drip shields. Temperature differences from natural convection were measured on the simulated waste package and drip shield. Water vapor pressure throughout the test cells varied by about 10%. The calculated dew point temperatures were always below temperatures on the simulated waste package and drip shield.
机译:Yucca山地现场表征项目已完成潜在储存库滴水屏蔽配置的两次试验规模测试,而不是废物包。一个测试包括滴水屏蔽上的回填,一个没有。这两个测试都是在潜在的储存库施加尺寸的1/4刻度构造,并且都采用了加热器来控制模拟漂移壁和模拟废物包的温度。测试结果证实滴水屏蔽如设计所示。没有明显的水穿透滴水屏蔽结构;在滴水屏蔽下没有检测到冷凝。在模拟废物包装和滴水屏蔽上测量与自然对流的温度差异。整个测试电池的水蒸气压变化约10%。计算的露点温度始终低于模拟废物包装和滴水屏蔽的温度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号