首页> 外文会议>Intersociety Energy Conversion Engineering Conference >Natural gas turbine topping of a low power integral PWR
【24h】

Natural gas turbine topping of a low power integral PWR

机译:天然燃气涡轮机顶部低功耗积分PWR

获取原文

摘要

Nuclear power plant designs are typically characterized by high capital and low fuel costs, while the opposite is true for fossil power generation including the natural gas-fired gas turbine combined cycle currently favored by many utilities worldwide. This paper examines potential advantages of combining nuclear and fossil (natural gas) generation options in a single plant. Technical and economic feasibility and attractiveness of a gas turbine - nuclear reactor combined cycle where gas turbine exhaust is used to superheat saturated steam produced by a low power light water reactor are examined. It is shown that in a certain range of fuel and capital costs of nuclear and fossil options, the proposed cycle offers an immediate economic advantage over standalone plants resulting from higher efficiency of nuclear part of the plant. Additionally, the gas turbine topping will result in higher fuel flexibility without the economic penalty typically associated with nuclear power.
机译:核电站设计通常具有高资本和低燃料成本的特征,而化石发电的相反是如此,包括目前在全球许多公用事业的自然燃气燃气涡轮机联合循环。本文研究了组合核和化石(天然气)发电选项在单一植物中的潜在优势。燃气轮机 - 核反应堆组合循环的技术和经济可行性及吸引力,其中燃气涡轮机排气用于通过低功率轻型水反应器生产的超热饱和蒸汽。结果表明,在核和化石选项的一定规模的燃料和资本成本中,拟议的循环在植物核部分核部分效率效率上产生了直接的经济优势。另外,燃气轮机顶部将导致较高的燃料灵活性,而无需经济罚款通常与核电相关。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号