Construction monitoring for a master planned community

机译:硕士规划社区的建设监测

获取原文

摘要

Snoqualmie Ridge is a 1340-acre master planned community being developed by Weyerhaeuser Real Estate Company (WRECO) near the city of Snoqualmie, Washington. Project planning started in the mid-1980s and construction started in November 1994. The Snoqualmie Ridge Project consists of an 18-hole TPC golf course, 2000 residential units, two business parks, a retail area, several community parks, and new municipal facilities including a water treatment plant, a police station, and a fire station. Erosion control on the Snoqualmie Ridge site is challenging due to topographic relief and on-site sensitive areas. The native soils are primarily weathered and unweathered glacial till containing 25 to 35 percent fines. The site is located on an upland plateau in the foothills of the Cascade Mountains. The project site has approximately 700 feet of vertical relief and contains five creeks, which are tributaries to the Snoqualmie River. Average annual rainfall is 70 inches. Initially, WRECO established a surface water monitoring plan to verify compliance with NPDES and the Federal Clean Water Act. This plan consisted of collecting grab samples at several locations on each stream and on the Snoqualmie River. These samples were obtained and tested for turbidity after each significant storm event (0.5" rain/24hr). In the fall of 1999, WRECO initiated an additional internal monitoring plan to more efficiently identify specific areas that were producing turbid water. A series of sample stations were selected torepresent small subbasin areas. Sampling was performed when the site received 0.5" rain in 24 hours, or at the erosion control inspector's discretion. This plan has helped to isolate and identify sources of turbid water and has aided in evaluating the performance of the BMPs. Pinpointing problem areas early and applying additional BMPs before there was a large problem was an essential part of maintaining an effective erosion control plan. A variety of standard and non-standard BMPs have been used at Snoqualmie Ridge. Straw mulch, silt fence, hydroseeding, swales and temporary sediment ponds all have been used as standard BMPs. Home construction phasing has been implemented and the driving and tracking equipment on soil is minimized during winter months. In order to reduce turbid water discharge to the on-site streams, sediment ponds that collect turbid water have been pumped into trucks and then released at an infiltration facility. The monitoring programs and additional BMP measures have been instrumental in our ability to continually improve the water quality on site.
机译:Snoqualmie Ridge是一家由Weyerhaeuser房地产公司(Wreco)开发的1340英亩的大型计划社区,靠近华盛顿州斯诺泻市。项目计划于1980年代中期开始,建设于1994年11月开始.Snoqualmie Ridge项目包括18洞TPC高尔夫球场,2000年住宅单位,两个商业园区,零售区,几个社区公园和新的市政设施,包括水处理厂,警察局和消防局。 Snoqualmie Ridge Site上的侵蚀控制因地形浮雕和现场敏感区域而挑战。本土土壤主要经过风化和未经调节的冰川,直至含有25%至35%的罚款。该网站位于级联山脉山麓的高原高原上。该项目现场大约有700英尺的垂直浮雕,其中包含五个小溪,这是斯诺普梅河的支流。年平均降雨量为70英寸。最初,Wreco建立了地表水监测计划,以验证符合NPDES和联邦清洁水法案。该计划包括在每条溪流上的几个地点和斯诺夸梅河上收集抢占样品。获得这些样品并在每次重大风暴事件(0.5英寸的雨/ 24小时后浊度)。在1999年下降,Wreco发起了额外的内部监测计划,以更有效地识别生产浑浊水的特定区域。一系列样品选择了托架的小组息区域。当网站在24小时内收到0.5英寸的雨时,或者在侵蚀控制督察的自由裁量权开始时,正在进行抽样。该计划有助于隔离和识别浑浊的来源,并辅助评估BMP的性能。在提前确定问题区域并在大问题之前申请额外的BMP是维持有效侵蚀控制计划的重要组成部分。 Snoqualmie山脊中使用了各种标准和非标BMP。秸秆覆盖物,淤泥栅栏,加氢索,萨瓦尔斯和临时沉积物池都被用作标准BMP。已经实施了家庭建筑阶段,并且在冬季,土壤上的驾驶和跟踪设备最小化。为了将浊度排放到现场流,将浑浊水的沉积池泵入卡车,然后在渗透设施释放。监测计划和额外的BMP措施在我们在现场不断提高水质的能力方面是有用的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号