【24h】

COAL BASIN MINE RECLAMATION CASE STUDY~1

机译:煤盆矿矿填海案例研究〜1

获取原文

摘要

The State of Colorado, Division of Minerals and Geology, is in the process of accomplishing reclamation of a previously permitted coal mining operation located in a high mountain basin in the central Rockies of western Colorado. Coal Basin is a large erosional feature located on the east facing slope of the Grand Hogback in Pitkin County, Colorado. High average annual precipitation, steep slopes and erosion prone soils combine to create the highly erosive nature of this area. Previously permitted mining operations substantially added to the sediment load in local stream systems. Five underground coal mine portal facilities, developed in the 1950's and 1960's along the steep flanks of Huntsman Ridge, are situated at elevation 3,048 meters (10,000 feet) in this rugged sub-alpine environment. Coal processing facilities, including a wash plant, thermal drier and coal refuse piles are located approximately five miles east of the mine entry areas at the confluence of Coal and Dutch Creeks at elevation 2,530 meters (8,300 feet). Due to the many unique geologic, topographic, environmental and operational challenges of Coal Basin, classic reclamation techniques and concepts were reevaluated and subsequently modified in order to meet the reclamation goals established for the site. Reclamation operations have focused on addressing the many environmental needs of Coal Basin by primarily minimizing active and potential erosion and resultant sedimentation from mining related facilities. The reclamation challenges are being met by implementing large scale geomorphic restoration operations and through innovative steep-slope revegetation practices. To this end, alternative, yet effective, erosion and sediment control techniques have been adopted, and unique revegetation procedures have been undertaken, as the reclamation process continues. This paper provides an overview of some of the techniques and methods used to stabilize this steep, highly erosive site.
机译:科罗拉多州科罗拉多州,矿物质和地质部门,正在进行填建位于科罗拉多州中央山谷的高山盆地的先前允许的煤矿运营的过程中。煤盆是一个大型侵蚀特征,位于科罗拉多州皮特金县的盛大辉煌的山坡上。高平均年降水量,陡坡和侵蚀易发的土壤结合,以创造该地区的高腐蚀性。以前允许的挖掘操作基本上添加到局部流系统中的沉积物负荷。五大地下煤矿门户设施,在1950年代和1960年代开发的猎豹山脊的陡峭侧翼,位于这个坚固的亚高山环境中的海拔3,048米(10,000英尺)。煤炭加工设施,包括洗涤厂,热干燥器和煤矸石桩在煤炭和荷兰小溪汇合以东大约五英里,海拔2,530米(8,300英尺)。由于煤池的许多独特的地质,地质,环境和运营挑战,经典的填海工程和概念被重新评估并随后修改,以满足该网站建立的填海目标。回收业务集中于通过主要减少采矿相关设施的主要和潜在的侵蚀和所产生的沉降来解决煤池的许多环境需求。通过实施大规模的地貌恢复操作和通过创新的陡坡坡度训练实践,正在满足填海挑战。为此,已经采用了替代,但有效,侵蚀和沉积物控制技术,并且已经进行了独特的植物植被程序,因为填海过程继续。本文概述了一些用于稳定这种陡峭,高腐蚀地点的技术和方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号