Starting and end shafts of the Sophia railway tunnel

机译:索菲亚铁路隧道的起始和结束轴

获取原文

摘要

The Sophia railway tunnel in the West of the Netherlands is at the moment under construction as part of the Betuwelijn railway line, a freight line from the port of Rotterdam to Zevenaar near the German border. The tunnel is located near Papendrechtand is 8115 meters long, crosses two rivers, two highways (the A15 and the A16), eleven local roads and the railway line Rotterdam-Dordrecht. The tunnel consists of 3875 meters of ramp sections (traditionally built, open and closed box sections) and 4240meters of bored tunnel sections with a slurry shield. The bored tunnel sections consist of two tubes with an inner diameter of 8.65 m. The newly developed continuous advance method has been used to construct the Mixshield. In this paper the design of the shafts at which the bored tunnel starts and ends will be discussed from a geotechnical point of view.
机译:荷兰西部的索菲亚火车隧道正在建设中,作为Betuwelijn铁路线的一部分,从鹿特丹港到德国边境附近的Zevenaar的货运线。隧道位于Papendrechtand附近,是8115米长,跨越两条河流,两条高速公路(A15和A16),11个当地道路和铁路线鹿特丹 - 多德雷赫特。隧道由3875米的斜坡部分(传统上构建,打开和封闭的盒子部分)和4240米的钻孔隧道部分,带有浆料屏蔽。钻孔隧道部分由两个内径为8.65米的管组成。新开发的连续提前方法已用于构建混合屏蔽。在本文中,将从岩土的观点来讨论钻孔隧道开始和结束的轴的设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号