...
首页> 外文期刊>Travaux >GRAND PARIS - LINE 15 SOUTH: OS 1302 P - DIAPHRAGM-WALL STARTING SHAFT FOR TUNNEL BORING MACHINES
【24h】

GRAND PARIS - LINE 15 SOUTH: OS 1302 P - DIAPHRAGM-WALL STARTING SHAFT FOR TUNNEL BORING MACHINES

机译:大巴黎 - 第15行南:OS 1302 P - 隔膜墙壁起始轴用于隧道镗床

获取原文
获取原文并翻译 | 示例
           

摘要

Société du Grand Paris commissioned the Horizon consortium for execution of work section T2A on Line 15 South. One of the main structures of the work section is OS 1302P, which is located on the edge of the Seine on former industrial waste land known as the "friche Arrighi". OS 1302 is key to the work section T2A project, because it is the starting shaft for two tunnel boring machines: TBM 4 which drills the section up to Villejuif - Louis-Aragon, and TBM 2 which drills the section up to Créteil-L'Échat Station. The structure executed by the diaphragm wall technique is 1.50 metres thick and has a rather peculiar shape which required finite element modelling. It consists of two lobes of inner diameter 26 metres, linked by two straight walls 21 metres long. To limit drainage flow rates, the diaphragm walls are anchored in the Lutetian limestone at a depth of 56 metres.
机译:SociétéDuGrand Paris委托地平线联盟,在15号线南部执行工作部分T2A。工作部分的主要结构之一是OS 1302P,它位于塞纳河的边缘,以前的工业废物土地被称为“Friche Arrighi”。 OS 1302是工作部分T2A项目的关键,因为它是两条隧道镗床的起始轴:TBM 4钻到Villejuif - Louis-Aragon和TBM 2的部分,它钻到Créteil-L'部分échat站。隔膜墙技术执行的结构厚1.50米,具有相当奇形的形状,需要有限元建模。它由两个内径26米的两个裂片组成,两个直线墙长21米长。为了限制排水流量,隔膜墙在卢特蒂斯石灰岩中以56米的深度锚定。

著录项

  • 来源
    《Travaux》 |2019年第950期|60-60|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 fre
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号